Differences between revisions 3 and 4
Revision 3 as of 2011-07-03 04:36:33
Size: 526
Comment:
Revision 4 as of 2011-07-07 02:37:23
Size: 570
Comment:
Deletions are marked like this. Additions are marked like this.
Line 36: Line 36:
== Procurement process and plans ==
TBD

Optical Lever

Related subgroups: VIS, IOO, MIF, VAC, CRY...


Scope

Optical lever for LCGT-SAS system

Applicable Documents

  • Spec. for vacuum chambers
  • Optical Layout drawing for LCGT interferometer
  • Any...

General Description

Receiver and Transmitter

Naming Conventions

TBD

Locations

  • BS chamber

Requirements

TBD

Characteristics

TBD

Inspection plans

TBD

Procurement process and plans

TBD

LCGT/subgroup/AOS/OptLev1 (last edited 2018-02-03 13:07:02 by KousekiMiyo)