Differences between revisions 10 and 17 (spanning 7 versions)
Revision 10 as of 2012-03-09 18:06:51
Size: 1581
Comment:
Revision 17 as of 2012-09-30 22:04:09
Size: 1889
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
'''[[../|..Up]]''' '''[[KAGRA/Subgroups/AOS| back to AOS top]]'''
Line 8: Line 8:
is to shut out the effects of stray lights appeared in the LCGT sensitivity.  . is to shut out the effects of stray lights appeared in the LCGT sensitivity.
Line 17: Line 17:
Baffles for stray light beams  . Baffles for stray light beams
Line 20: Line 20:
TBD  . TBD
Line 31: Line 31:
TBD  . TBD
Line 34: Line 34:
TBD  . TBD
Line 38: Line 38:
TBD  . TBD
Line 41: Line 41:
TBD  . TBD
Line 47: Line 47:
 * [[https://dcc.ligo.org/cgi-bin/DocDB/ShowDocument?.submit=Number&docid=T1100165&version= |LIGO-T1100165-v2, AOS SLC Manifold/Cryopump and Mode Cleaner Tube Baffles FDR]]
 * [[https://dcc.ligo.org/cgi-bin/DocDB/ShowDocument?.submit=Number&docid=G1100451|LIGO-G1100451-v3, Stray Light Control & Viewports]]
Line 52: Line 50:
 * [[https://www.jstage.jst.go.jp/article/jvsj/48/5/48_5_301/_article/-char/ja/|Tomaru et al., ニッケル-リン光吸収体の真空特性と光学特性評価]]


== LIGO Links ==
 * [[http://www.ligo.caltech.edu/~gari/|LIGO Core Optics Properties]]
 * [[https://dcc.ligo.org/cgi-bin/DocDB/ShowDocument?.submit=Number&docid=T1100165&version= |LIGO-T1100165-v2, AOS SLC Manifold/Cryopump and Mode Cleaner Tube Baffles FDR]]
 * [[https://dcc.ligo.org/cgi-bin/DocDB/ShowDocument?.submit=Number&docid=G1100451|LIGO-G1100451-v3, Stray Light Control & Viewports]]

Stray Light Control

Related subgroups: IOO, MIF, VAC, CRY, VIS


back to AOS top

Scope

  • is to shut out the effects of stray lights appeared in the LCGT sensitivity.

Applicable Documents

General Description

Functions

  • Baffles for stray light beams

Naming Conventions

  • TBD

Locations

  • BS chamber
  • ITM chambers (X,Y)
  • ETM chambers (X,Y)
  • PRC chambers (dummyPRC, PR2, PR3)
  • SRC chambers (dummySRC, SR2, SR3)
  • MC chambers (MC1, MC2...)

Requirements

  • TBD

Characteristics

  • TBD

Inspection plans

  • TBD

Procurement process and plans

  • TBD

LCGT/subgroup/AOS/StrayLight1 (last edited 2012-10-05 01:55:28 by KiwamuIzumi)