1889
Comment:
|
← Revision 24 as of 2012-10-05 01:55:28 ⇥
2240
|
Deletions are marked like this. | Additions are marked like this. |
Line 43: | Line 43: |
== Documents == * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1301| JGW-T1201301-v1, SLC design document]] |
|
Line 45: | Line 48: |
* [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=54|JGW-G0900054]] | * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=54|JGW-G0900054, 高品質鏡のための微小散乱計測システムの開発]] |
Line 47: | Line 50: |
* [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=418|JGW-G1100418]] |
|
Line 51: | Line 52: |
* [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1297|JGW-T1201297, Baffle material summary]] | |
Line 57: | Line 58: |
* [[https://dcc.ligo.org/cgi-bin/private/DocDB/ShowDocument?docid=36490|LIGO-G070240, Scattering Loss @ CIT on 4/11/07]] |
Stray Light Control
Related subgroups: IOO, MIF, VAC, CRY, VIS
Contents
Scope
- is to shut out the effects of stray lights appeared in the LCGT sensitivity.
Applicable Documents
General Description
Functions
- Baffles for stray light beams
Naming Conventions
- TBD
Locations
- BS chamber
- ITM chambers (X,Y)
- ETM chambers (X,Y)
- PRC chambers (dummyPRC, PR2, PR3)
- SRC chambers (dummySRC, SR2, SR3)
- MC chambers (MC1, MC2...)
Requirements
- TBD
Characteristics
- TBD
Inspection plans
- TBD
Procurement process and plans
- TBD
Documents
Links