Differences between revisions 2 and 20 (spanning 18 versions)
Revision 2 as of 2011-08-05 02:32:57
Size: 680
Comment:
Revision 20 as of 2012-09-30 22:06:32
Size: 1852
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
'''[[KAGRA/Subgroups/AOS| back to AOS top]]'''
Line 7: Line 8:
is to shut out the effects of stray lights appeared in the LCGT sensitivity.  . is to shut out the effects of stray lights appeared in the LCGT sensitivity.
Line 16: Line 17:
Baffles for stray light beams  . Baffles for stray light beams
Line 19: Line 20:
TBD  . TBD
Line 23: Line 24:
 *  * ITM chambers (X,Y)
 * ETM chambers (X,Y)
 * PRC chambers (dummyPRC, PR2, PR3)
 * SRC chambers (dummySRC, SR2, SR3)
 * MC chambers (MC1, MC2...)
Line 26: Line 31:
TBD  . TBD
Line 29: Line 34:
TBD  . TBD
Line 33: Line 38:
TBD  . TBD
Line 36: Line 41:
TBD  . TBD
Line 40: Line 45:
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=54|JGW-G0900054, 高品質鏡のための微小散乱計測システムの開発]]
 * [[http://tamago.mtk.nao.ac.jp/takutsu/lcgt/01_StrayLightControl/doc/|Some domuments on stray-light control investigated at TAMA300 in NAOJ]]
 * [[http://prd.aps.org/abstract/PRD/v70/i6/e062003|R. Takahashi, K. Arai, S. Kawamura and, M. Smith, Direct measurement of the scattered light effect on the sensitivity in TAMA300, Phys. Rev. D70, 062003 (2004)]]
 * [[https://www.jstage.jst.go.jp/article/jvsj/48/5/48_5_301/_article/-char/ja/|Tomaru et al., ニッケル-リン光吸収体の真空特性と光学特性評価]]


== LIGO Links ==
 * [[http://www.ligo.caltech.edu/~gari/|LIGO Core Optics Properties]]
 * [[https://dcc.ligo.org/cgi-bin/DocDB/ShowDocument?.submit=Number&docid=T1100165&version= |LIGO-T1100165-v2, AOS SLC Manifold/Cryopump and Mode Cleaner Tube Baffles FDR]]

Stray Light Control

Related subgroups: IOO, MIF, VAC, CRY, VIS


back to AOS top

Scope

  • is to shut out the effects of stray lights appeared in the LCGT sensitivity.

Applicable Documents

General Description

Functions

  • Baffles for stray light beams

Naming Conventions

  • TBD

Locations

  • BS chamber
  • ITM chambers (X,Y)
  • ETM chambers (X,Y)
  • PRC chambers (dummyPRC, PR2, PR3)
  • SRC chambers (dummySRC, SR2, SR3)
  • MC chambers (MC1, MC2...)

Requirements

  • TBD

Characteristics

  • TBD

Inspection plans

  • TBD

Procurement process and plans

  • TBD

LCGT/subgroup/AOS/StrayLight1 (last edited 2012-10-05 01:55:28 by KiwamuIzumi)