Differences between revisions 6 and 10 (spanning 4 versions)
Revision 6 as of 2011-09-01 12:09:51
Size: 1191
Comment:
Revision 10 as of 2012-03-09 18:06:51
Size: 1581
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
'''[[../|..Up]]'''
Line 44: Line 45:
 * [[http://tamago.mtk.nao.ac.jp/takutsu/lcgt/01_StrayLightControl/doc/|Some domuments]]  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=54|JGW-G0900054]]
* [[http://tamago.mtk.nao.ac.jp/takutsu/lcgt/01_StrayLightControl/doc/|Some domuments on stray-light control investigated at TAMA300 in NAOJ]]
Line 48: Line 50:

 * [[http://prd.aps.org/abstract/PRD/v70/i6/e062003|R. Takahashi, K. Arai, S. Kawamura and, M. Smith, Direct measurement of the scattered light effect on the sensitivity in TAMA300, Phys. Rev. D70, 062003 (2004)]]

Stray Light Control

Related subgroups: IOO, MIF, VAC, CRY, VIS


..Up

Scope

is to shut out the effects of stray lights appeared in the LCGT sensitivity.

Applicable Documents

General Description

Functions

Baffles for stray light beams

Naming Conventions

TBD

Locations

  • BS chamber
  • ITM chambers (X,Y)
  • ETM chambers (X,Y)
  • PRC chambers (dummyPRC, PR2, PR3)
  • SRC chambers (dummySRC, SR2, SR3)
  • MC chambers (MC1, MC2...)

Requirements

TBD

Characteristics

TBD

Inspection plans

TBD

Procurement process and plans

TBD

LCGT/subgroup/AOS/StrayLight1 (last edited 2012-10-05 01:55:28 by KiwamuIzumi)