Differences between revisions 6 and 7
Revision 6 as of 2011-09-01 12:09:51
Size: 1191
Comment:
Revision 7 as of 2011-09-01 12:11:19
Size: 1246
Comment:
Deletions are marked like this. Additions are marked like this.
Line 44: Line 44:
 * [[http://tamago.mtk.nao.ac.jp/takutsu/lcgt/01_StrayLightControl/doc/|Some domuments]]  * [[http://tamago.mtk.nao.ac.jp/takutsu/lcgt/01_StrayLightControl/doc/|Some domuments on stray-light control investigated at TAMA300 in NAOJ]]

Stray Light Control

Related subgroups: IOO, MIF, VAC, CRY, VIS


Scope

is to shut out the effects of stray lights appeared in the LCGT sensitivity.

Applicable Documents

General Description

Functions

Baffles for stray light beams

Naming Conventions

TBD

Locations

  • BS chamber
  • ITM chambers (X,Y)
  • ETM chambers (X,Y)
  • PRC chambers (dummyPRC, PR2, PR3)
  • SRC chambers (dummySRC, SR2, SR3)
  • MC chambers (MC1, MC2...)

Requirements

TBD

Characteristics

TBD

Inspection plans

TBD

Procurement process and plans

TBD

LCGT/subgroup/AOS/StrayLight1 (last edited 2012-10-05 01:55:28 by KiwamuIzumi)