Differences between revisions 9 and 11 (spanning 2 versions)
Revision 9 as of 2011-10-06 19:50:20
Size: 1363
Comment:
Revision 11 as of 2012-09-16 20:31:43
Size: 1602
Editor: KiwamuIzumi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
is to shut out the effects of stray lights appeared in the LCGT sensitivity.  . is to shut out the effects of stray lights appeared in the LCGT sensitivity.
Line 17: Line 17:
Baffles for stray light beams  . Baffles for stray light beams
Line 20: Line 20:
TBD  . TBD
Line 31: Line 31:
TBD  . TBD
Line 34: Line 34:
TBD  . TBD
Line 38: Line 38:
TBD  . TBD
Line 41: Line 41:
TBD  . TBD
Line 50: Line 50:

 * [[http://prd.aps.org/abstract/PRD/v70/i6/e062003|R. Takahashi, K. Arai, S. Kawamura and, M. Smith, Direct measurement of the scattered light effect on the sensitivity in TAMA300, Phys. Rev. D70, 062003 (2004)]]

Stray Light Control

Related subgroups: IOO, MIF, VAC, CRY, VIS


..Up

Scope

  • is to shut out the effects of stray lights appeared in the LCGT sensitivity.

Applicable Documents

General Description

Functions

  • Baffles for stray light beams

Naming Conventions

  • TBD

Locations

  • BS chamber
  • ITM chambers (X,Y)
  • ETM chambers (X,Y)
  • PRC chambers (dummyPRC, PR2, PR3)
  • SRC chambers (dummySRC, SR2, SR3)
  • MC chambers (MC1, MC2...)

Requirements

  • TBD

Characteristics

  • TBD

Inspection plans

  • TBD

Procurement process and plans

  • TBD

LCGT/subgroup/AOS/StrayLight1 (last edited 2012-10-05 01:55:28 by KiwamuIzumi)