= 20180123 = [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4018]] == Today's activity == === At Kamioka === Workers: Akutsu, Miyo, Hasegawa * Brought a SUS table into the IYC clean booth; covered with aluminum foil. * Brought a metal rack to stock parts. * Brought two oplev viewport windows. * Brought a set of oplev setup. * Brought two hex wrench sets. * Brought two wrenches for anchor bolts for oplev pylons. * Wanted '''''cutters and scissors!!''''' * Wanted a clock to know the time easily. * Wanted/needed a fiber cleaner to connect oplev source parts; '''''need to get back''''' from Yend. * Wanted M6 screw set. * Found water springs from anchor bolts for oplev pylons; '''''need cares!''''' * Checked the current status of the inside of the IYC chamber; '''''need to confirm''''' what are the scratch lines made by the measurement by the KEK team last week. === At Mitaka === * Hirata-san and Simon took care of delivery of the WAB suspension; a transportation company 三村運送 picked up the stuff, and will be delivered tomorrow, if the weather allows it (will be heavy snow tomorrow.) == Tomorrow's plan == * Pick up a QPD board for the oplev! * Accept the delivered WAB suspension. * Check the temperature of the WAB suspension; when we don't feel bedewing, let's unpack it. * Check small parts which Simon will bring with him. * Prepare some measurement setup * Check tilt of the basement optical table in the IYC chamber. * Check heights of several points; need to have a laser leveler and a horizontal ruler with a tiltmeter.