= 20180124 = [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4022]] == Today's activity == Workers: Akutsu, Simon, Miyo, Hasegawa * Received the WAB suspension at the tunnel entrance and brought it into the IYC clean booth with helps by Furuta-san and Nakada-san, and management of Uchiyama-san. * Thought we must need '''''new handles''''' for easier transporting the WAB suspension for the future; today we managed somehow. * Found bedewing (condensation of water) on the WAB suspension as predicted; gently covered some flat sections of the suspension with vectra10, and left it; in a few hours the dews disappeared. * Brought some measurement instruments into the IYC clean booth; they were: * a tripod stand (from TypeB) * a laser marker (from TypeB but from KEK-GR) * two bubble levelers (from TypeB) * a height gauge (from TypeB) * Brought two burndy cables (one of the two is from IXC) into the clean booth. * Brought two heaters each of which is attached to an aluminum plate (Simon delivered with him) * Brought a current source (from IXC) near the booth. * Brought a tool box (from IXC) near the booth. * '''[Ongoing]''' Need cares of water springs from anchor bolts for oplev pylons; '''''ongoing'''''. * '''[Ongoing]''' Need to confirm what are the scratch lines made by the measurement by the KEK team last week. * Slightly checked the tilt of the basement optical table located in the IYC chamber with a bubble leveler (mentioned above) by Akutsu; it seems nice; the bubble leveler shows it can measure 0.5mm/1m tilt on its body. * Wanted '''''cutters and scissors!!''''' * Wanted a clock to know the time easily. * Wanted/needed a fiber cleaner to connect oplev source parts; '''''need to get back''''' from Yend. * Wanted M6 screw set. === What Simon delivered with him === * six thermometers; stocked in a plastic box at the entrance of the IYC clean booth. * The metal. * a coil * several nuts * two heaters (as mentioned above.) == Tomorrow's plan == * Pick up a QPD board for the oplev! * Pick up OptoSigma parts sent to Akutsu. * Pick up parts sent to Simon. * Try to locate the WAB suspension to its nominal position. * Take it back to the table and detach some guard parts and check the balance, and attach them back; * Attach heater plates? * Try to connect bundy pins to the heaters?? * Place bundy cables toward outside? * '''[Slightly done]''' Check tilt of the basement optical table in the IYC chamber. * Check heights of several points. * Wash the coil in ethanol at Univ. of Toyama...? * Wash nuts in machine cleaner at Mozumi. * Take care of water spring??