= 20180201 = * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4091]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4090]] == Today's activities == Workers: Akutsu, Miyo, Hasegawa * Continued to attach burndy receptacle pins to the thermometers' wires. * Now 6 thermometers have pins; 5 out of 6 thermometers were '''''online''''' by a cryocon; the five were attached to the WAB and the suspension without indium sheet, '''''so don't forget to attach the metals sheets''''' * The coat of a red wire of one of the thermometer was adhered to its green wire's coat, and tended to delaminate. Doing some tricky and careful works, this issue was resolved; again, careful visual inspection would be a key to resolve an issue. * Attached burndy receptacle pins to two heaters in the chamber * The two heaters were connected in parallel; in other words, two wires from different heaters are swaged to a single pin. * Tested the heater via the distributor located outside of the clean booth; one person in the chamber touched the heater with gloved hand but did not feel any warming up; with a contact-type handy thermometer, found the rise/drop of the temperature of the heater along with the switch turned on/off. * The resistance between W-X from P23 at the distributor box was measured as 32.5 ohm, while a heater is 50 ohm on the specification, and that of the paralleled heates was measured 25 ohm as expected. * Set up the oplev; the pylon was rigidly fixed to the floor; an ND filter, borrowed from Kokeyama-san, was put in front of the QPD. * Calibrated the QPD of the oplev. See [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4090|here]]; need to do further conversion to urad. * '''[Ongoing]''' Need cares of water springs from anchor bolts for oplev pylons. * '''[Ongoing]''' Need to confirm what are the scratch lines made by the measurement by the KEK team last week. == Next plan == * Complete the calibration of the oplev; '''''what is the arm length?''''' * Check the balance of the suspended WAB with some wires and sensors are attached. * Check how the damping would be now after the replacement of the damping magnets. * Check the reproducibility of the alignment of the suspension among several modes. * Prepare calibration of photosensors. * Check heights of several points. * Wash the coil in ethanol at Univ. of Toyama...? * Take care of water spring?? == Wanted! == * A tweezer. * Two burndy connectors, vacuum compatible. * Chairs in the clean booth * Cutters and scissors!! * '''''Stages outside the chamber''''' to ease wiping our legs. * Good '''''rail(?)''''' to move the WAB suspension in the cryostat in the main beam direction. * '''''Chain block?''''' to support the load in the chamber. * A clock to know the time easily. * M6 screw set.