= 20180207 = * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4133]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4134]] == Today's activities == Workers: Akutsu, Simon, Miyo * Continued to check the balance or alignment of the suspended WAB with using a laser marker (レーザー墨出器). * About pitch and yaw, see [[../2018-02-06|20180206]]. * Yaw was checked. See [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4133|here]]. Additional memo: we will use '''the gaps of the two apart flanges''' supporting the WAB to references of a longitudinal line on the WAB. * Changed the power supply unit of the digital system. * Assembled a photosensor (PS) head. See [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4134|here]]. * Cutting out pieces of cupper tubes was tricky at first, but in the end it can be done smoothly (Akutsu). * '''[Ongoing]''' Need cares of water springs from anchor bolts for oplev pylons. * '''[Ongoing]''' Need to confirm what are the scratch lines made by the measurement by the KEK team last week. == Next plan == * Wash the coil and the PS parts in ethanol at Univ. of Toyama...? * Complete the assembly of the PS heads with clean parts (or wash them after assembled) * Make some patch cables to connect Dsub and the distributor for the PS. * Calibrate the PS. * Complete the calibration of the oplev; the arm length was reported by Simon, so.... * Check the balance of the suspended WAB with some wires and sensors are attached. * Check how the damping would be now after the replacement of the damping magnets. * Check the reproducibility of the alignment of the suspension among several modes. * Prepare calibration of photosensors. * Check heights of several points. * Take care of water spring?? == Wanted! == * A tweezer. * Two burndy connectors, vacuum compatible. * Chairs in the clean booth * Cutters and scissors!! * '''''Stages outside the chamber''''' to ease wiping our legs. * Good '''''rail(?)''''' to move the WAB suspension in the cryostat in the main beam direction. * '''''Chain block?''''' to support the load in the chamber. * A clock to know the time easily. * M6 screw set.