= 20180213 = * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4171]] == Today's activities == * Tanioka made several patch cables between Dsub and the signal distributor according to Miyo's suggestions. * Akutsu collected unwashed parts to be used in vacuum, and washed them with ethanol in a supersonic bath at Univ. of Toyama; thanks to Yamamoto-san. * The Coil, the PDs and the LEDs were also washed. (For LEDs, never use acetone!!! please read the manual.) * The copper pipes were also washed. * '''[Ongoing]''' Need cares of water springs from anchor bolts for oplev pylons. * '''[Ongoing]''' Need to confirm what are the scratch lines made by the measurement by the KEK team last week. == Next plan == * Complete the assembly of the PS heads with clean parts (or wash them after assembled) * Calibrate the PS. * Complete the calibration of the oplev; the arm length was reported by Simon, so.... * Check the balance of the suspended WAB with some wires and sensors are attached. * Check how the damping would be now after the replacement of the damping magnets. * Check the reproducibility of the alignment of the suspension among several modes. * Prepare calibration of photosensors. * Check heights of several points. * Take care of water spring?? == Wanted! == * A tweezer. * Two burndy connectors, vacuum compatible. * Chairs in the clean booth * Cutters and scissors!! * '''''Stages outside the chamber''''' to ease wiping our legs. * Good '''''rail(?)''''' to move the WAB suspension in the cryostat in the main beam direction. * '''''Chain block?''''' to support the load in the chamber. * A clock to know the time easily. * M6 screw set.