= 20180228 = * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4296]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4311]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4313]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4315]] == Today's activities == Workers: Simon, Akutsu * Measured the current distance from the reflector to each photosensor head; X~18mm, Y~16.5mm, Z~17mm. * Re-screwed M8 bolts of the heat-link anchor block to the cryo-head with M8 washers and spring washers; tighten. * Picked a thermometer with Akutsu's gloved hand to check the difference of heat touching of the thermometer; see [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4315|here]] * When I picked it during it was attached to the WAB suspension's top, the temperature rise was very small. * Then I detached the thermometer after waiting for the unpicked temperature got back, and picked it again and find the temperature rising was very drastic ('''''quantitative report should be here''''', again) * Then I again attached it carefully, and checked the temperature rising, and this time the rise ratio was actually small ('''''again.....''''') * Re-centered the oplev. * Miyo-kun started to re-assign the matrix from PS1, PS2, and PS3 to X, Y, and Z. * '''''Should be reported later''''' * This re-assign will (ex)change the channel names; to call back the past data, you need to know what was the channel name '''at that time...''' In other words, the name change won't change the past ch names! * '''[Ongoing]''' Need cares of water springs from anchor bolts for oplev pylons. * '''[Ongoing]''' Need to confirm what are the scratch lines made by the measurement by the KEK team last week. == Next plan == * Complete the PS calibration. * Complete the calibration of the oplev; the arm length was reported by Simon, so.... * Complete the signal matrix. * Lower the position of the WAB for cooling down. * Make heat connection upper and lower part of the suspension by Cu wires. * Make heat anchors for some electric wires in which large current will flow. * Optimize the current amount to the coil. * Check the balance of the suspended WAB with some wires and sensors are attached. * Check how the damping would be now after the replacement of the damping magnets. * Check the reproducibility of the alignment of the suspension among several modes. * Check heights of several points. * Take care of water spring?? == Wanted! == * Two burndy connectors, vacuum compatible. * '''''Stages outside the chamber''''' to ease wiping our legs. * Good '''''rail(?)''''' to move the WAB suspension in the cryostat in the main beam direction. * '''''Chain block?''''' to support the load in the chamber. * A clock to know the time easily. * M6 screw set.