= 20180306 = * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4360]] == Today's activities == Workers: Miyo, Akutsu * Connected an easy heat link from the top to the suspension structure; see [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4360|here]]. * Completed the setup. * Injected coil actuation in the several current amounts (actually voltage setups); '''''reported later.''''' * '''[Ongoing]''' Need cares of water springs from anchor bolts for oplev pylons. * '''[Ongoing]''' Need to confirm what are the scratch lines made by the measurement by the KEK team last week. == Next plan == * Complete the PS calibration. * Complete the calibration of the oplev; the arm length was reported by Simon, so.... * Complete the signal matrix. * Check the balance of the suspended WAB with some wires and sensors are attached. * Check how the damping would be now after the replacement of the damping magnets. * Check the reproducibility of the alignment of the suspension among several modes. * Check heights of several points. * Take care of water spring?? == Wanted! == * Two burndy connectors, vacuum compatible. * '''''Stages outside the chamber''''' to ease wiping our legs. * Good '''''rail(?)''''' to move the WAB suspension in the cryostat in the main beam direction. * '''''Chain block?''''' to support the load in the chamber. * A clock to know the time easily. * M6 screw set.