20180320
Today's activities
Simon did a report.
[Ongoing] Need cares of water springs from anchor bolts for oplev pylons.
Next plan
- Check the balance of the suspended WAB with some wires and sensors are attached.
- Check how the damping would be now after the replacement of the damping magnets.
- Check the reproducibility of the alignment of the suspension among several modes.
- Check heights of several points.
- Take care of water spring??
Wanted!
Good rail(?) to move the WAB suspension in the cryostat in the main beam direction.
Chain block? to support the load in the chamber.