= 20180322 =
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4517]]
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4519]]

== Today's activities ==
 * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=4519|Cooling started]]. 
 * '''[Ongoing]''' Need cares of water springs from anchor bolts for oplev pylons.

== Next plan ==
 * Check the balance of the suspended WAB with some wires and sensors are attached.
 * Check how the damping would be now after the replacement of the damping magnets.
 * Check the reproducibility of the alignment of the suspension among several modes.  
 * Check heights of several points.
 * Take care of water spring??

== Wanted! ==
 * Good '''''rail(?)''''' to move the WAB suspension in the cryostat in the main beam direction.
 * '''''Chain block?''''' to support the load in the chamber.