Differences between revisions 1 and 2
Revision 1 as of 2018-04-27 01:16:01
Size: 670
Comment:
Revision 2 as of 2018-04-27 01:16:17
Size: 670
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= 20180419 = = 20180427 =

20180427

Today's activities

Next plan

  • Check the balance of the suspended WAB with some wires and sensors are attached.
  • Check how the damping would be now after the replacement of the damping magnets.
  • Check the reproducibility of the alignment of the suspension among several modes.
  • Check heights of several points.
  • Take care of water spring??

Wanted!

  • Good rail(?) to move the WAB suspension in the cryostat in the main beam direction.

  • Chain block? to support the load in the chamber.

LCGT/subgroup/AOS/WideAngleBuffle/2018-04-27 (last edited 2018-04-27 01:17:26 by TomotadaAkutsu)