Size: 670
Comment:
|
← Revision 3 as of 2018-04-27 01:17:26 ⇥
Size: 720
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
{{attachment:Fit_WAB_temp20180426.png||width=400}} |
20180427
Today's activities
Next plan
- Check the balance of the suspended WAB with some wires and sensors are attached.
- Check how the damping would be now after the replacement of the damping magnets.
- Check the reproducibility of the alignment of the suspension among several modes.
- Check heights of several points.
- Take care of water spring??
Wanted!
Good rail(?) to move the WAB suspension in the cryostat in the main beam direction.
Chain block? to support the load in the chamber.