Differences between revisions 9 and 10
Revision 9 as of 2009-06-04 09:19:41
Size: 952
Editor: ANDO Masaki
Comment:
Revision 10 as of 2009-06-04 09:20:03
Size: 954
Editor: ANDO Masaki
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
.議題:
.現状報告
 .議題:
 .現状報告

PROJECT TOP

GW Analysis

Interferometer

Vacuum & Cryostat

Laser & Optics

Seismic Isolator

Infrastructure

LCGT 干渉計検討特別作業班

検討会

.日時: 2009年6月9日 (火) 13:30-17:00 (早め終了を目指す)

  • 議題:
  • 現状報告
    • これまでの議論の復習 (安東)
    • 観測対象の検討 (神田さん)
    • 到達感度評価 (宗宮さん)
    • 信号取得方式 (麻生さん)
    • 文書化と今後の進め方 議論
    • 決定事項とA/Iの確認

-

資料

LCGT/subgroup/ifo/BW (last edited 2012-06-07 09:24:32 by OsamuMiyakawa)