Differences between revisions 1 and 7 (spanning 6 versions)
Revision 1 as of 2010-05-27 08:40:45
Size: 206
Comment:
Revision 7 as of 2010-05-28 15:36:28
Size: 1179
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

== Preliminary (base) desisn of folded stable cavities ==
The task is to determine the locations and the ROCs of the folding
mirrors given the following constraints.

=== Boundary Conditions ===
The boundary conditions for the design of the folded RCs are the following.
{{attachment:BoundaryCondition1.png| |width=700}}

 * The TEM00 mode in the RCs should match the arm cavity modes.
 * Out of 73m of the RC length, 25m should be allocated between the BS and the ITMs for radiation shield.
 * The Gouy phase shift in the RC (one-way) must be about 20deg.
 * The beam spot sizes on the optics should not be too small (what is the tolerance ?).
 * There is a minimum distance between, e.g., the PRM and PR2 coming from the size of the SAS.

== Preliminary (base) design of unfolded stable cavities ==
[[attachment:100429.pdf]]

== Current design of marginally stable cavities ==
Line 6: Line 25:

== Old (current) layout of vacuum tanks ==
 * Layout
 * Limitations

Describe LCGT/subgroup/ifo/ISC/TaskList/SpatialMode/SpatialModeDesign here.

Preliminary (base) desisn of folded stable cavities

The task is to determine the locations and the ROCs of the folding mirrors given the following constraints.

Boundary Conditions

The boundary conditions for the design of the folded RCs are the following.

  • The TEM00 mode in the RCs should match the arm cavity modes.
  • Out of 73m of the RC length, 25m should be allocated between the BS and the ITMs for radiation shield.
  • The Gouy phase shift in the RC (one-way) must be about 20deg.
  • The beam spot sizes on the optics should not be too small (what is the tolerance ?).
  • There is a minimum distance between, e.g., the PRM and PR2 coming from the size of the SAS.

Preliminary (base) design of unfolded stable cavities

100429.pdf

Current design of marginally stable cavities

Some limitations in the view of vacuum and seismic attenuation group

  • maximum beam shift
  • minimum tank separation

Old (current) layout of vacuum tanks

  • Layout
  • Limitations

LCGT/subgroup/ifo/ISC/TaskList/SpatialMode/SpatialModeDesign (last edited 2010-08-05 13:08:35 by DaisukeTatsumi)