Differences between revisions 6 and 10 (spanning 4 versions)
Revision 6 as of 2009-05-05 16:41:58
Size: 1113
Editor: YoichiAso
Comment:
Revision 10 as of 2009-05-21 09:42:34
Size: 1292
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 * '''If Not, Propose Alternative Solutions'''  * '''If No, Propose Alternative Solutions'''
Line 15: Line 15:
[[/Meeting|Meetings]]
----
Line 18: Line 20:
----
=== Tasks ===
Line 19: Line 23:
==== SPI design ====

==== Heatlink Isolation ====

==== Lock Acquisition ====
 
Line 23: Line 33:

----
[[/PastDiscuss|Past discussions]]

SPI Working Group

Objectives

  • To Decide Whether SPI is Necessary for LCGT

  • If Yes, Show Feasibility

  • If No, Propose Alternative Solutions

About the Working Group and this Wiki page

This is a special working group to study the necessity and feasibility of SPI for LCGT. This Wiki page is intended to collect information on the work group. Results from the activities of the working group will be put on this page.

Approach

The main question to be answered by this working group is whether SPI is necessary for LCGT or not. To answer this question, first we have to identify what are the benefits of SPI for LCGT and what alternative techniques are available for each benefit. We also have to prioritize the benefits and identify the critical factors (probably the vibration isolation of the heat links). Then compare the technical feasibility and costs for SPI and alternative techniques to answer the main question.


Meetings


Organization

Time Frame


Tasks

SPI design

Lock Acquisition

Task List


Benefits of SPI


Past discussions

LCGT/subgroup/ifo/SPI (last edited 2009-07-10 11:10:23 by whitehole)