Differences between revisions 4 and 38 (spanning 34 versions)
Revision 4 as of 2009-05-06 12:56:26
Size: 685
Editor: whitehole
Comment:
Revision 38 as of 2010-11-19 10:17:58
Size: 1312
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
|| '''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/machanics|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] ||
Line 5: Line 3:
=== System definition ===
This system should has the following functions
 * Digital control system,
 * Detector diagnosis,
 * Auto lock / Auto alignment sequncer, and
 * Detector operation for GW observation.
These basic concepts are described in LCGT design document: Chapter 16 and 17.
[[attachment:LCGTdoc_J4_observation_system.pdf|観測システム]]
[[]]
 [[LCGT/subgroup/ifo/digital/members|members]]

----
=== Meeting ===
==== November 19, 2010, 10:00(JST)~ ====
 * Agenda
  * 予算執行状況
  * 今後の会議について
  * [[LCGT/subgroup/ifo/digital/meeting/20101119/ActionItem/レビューのアクションアイテムについての割り振り]]
  * Gentoo最新情報(道村君)

 * [[LCGT/subgroup/ifo/digital/meeting/20101119/minute|議事録]]

----
== Documents ==

 [[LCGT/subgroup/ifo/digital/ICD|Interface Control Document]]

=== System definition / Conceptual design ===
These basic concepts are described in LCGT design document: Chapter 16 and 17.<<BR>>
 [[attachment:LCGTdoc_J4_observation_system.pdf|観測システム]] <<BR>>
 [[attachment:lcgt-daq_v3.pdf|データ取得 (informal updated vesion of 3)]]

=== Design and Schedule ===
 *[[LCGT/subgroup/ifo/digital/design|Conceptual design (検討項目)]]: 上記文書のアップデートを兼ねます。各項目の担当を決めて文書化を進めます。

 * [[LCGT/subgroup/ifo/digital/Timing|Timing System]]
 * [[LCGT/subgroup/ifo/digital/EPICS|EPICS]]
 * [[LCGT/subgroup/ifo/digital/Distr|デジタルシステムの配布]]

=== Related systems ===
 * [[LCGT/subgroup/ifo/digital/related_systems|Related systems]]

Digital systems


Meeting

November 19, 2010, 10:00(JST)~


Documents

System definition / Conceptual design

These basic concepts are described in LCGT design document: Chapter 16 and 17.

Design and Schedule

LCGT/subgroup/ifo/digital (last edited 2012-06-06 12:43:09 by OsamuMiyakawa)