492
Comment:
|
1929
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
||[[LCGT|PROJECT]] ||[[LCGT/Meeting|MEETING]] ||[[LCGT/Plans|SCHEDULES&TASKS]] ||[[LCGT/Technical|TECHNICAL]] ||[[LCGT/Links|LINKS]] ||[[LCGT/HowTo|HOWTO]] || | |
Line 4: | Line 3: |
== Project sub group == '''[[LCGT/subgroup|2009年度 推進体制]]''' [[LCGT/subgroup/howtojoin|各サブグループへの参加の仕方]] |
=== news === * The next face-to-face meeting is on Feb 4-5th at Kashiwa Campus. * LCGT Roadmap meeting has started. === Project time-line and iLCGT organization charts === [[attachment:timeline.png|{{attachment:timeline.png|Subject to change|width=300}}|width=300]] [[attachment:organization.png|{{attachment:organization.png|approved on Nov 2nd|width=200}}|width=200]] * iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration. * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration. === Links === ||[[LCGT/Meeting| Meetings]] || * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] || ||Subsystem || [[LCGT/subgroup|iLCGT subsystem wiki]] || ||Special WG || * [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> * [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> * [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> * [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> * [[JGWDoc/HowTo/UpLoad|how to upload documents]] || |
Line 10: | Line 22: |
. [[LCGT/3month_study|2009年 3ヶ月study]] . [[LCGT/todo|LCGT to do list]] |
=== Technical Details === .[[LCGT/Technical|TECHNICAL]] (parameters, simulation codes, etc.) [[attachment:sensitivity.png|{{attachment:sensitivity.png|latest sensitivity curve|width=400}}|width=400]] |
Line 14: | Line 27: |
== Wiki How To == * [[newusers|このwikiが初めての方へ]] |
=== LCGT Official Documents === .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]] .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]] ---- === Others === .[[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.) .[[newusers|How to use this wiki page]] .[[LCGT/old|Old wiki page]] |
LCGT wiki
news
- The next face-to-face meeting is on Feb 4-5th at Kashiwa Campus.
- LCGT Roadmap meeting has started.
Project time-line and iLCGT organization charts
- iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration.
- bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.
Links
|
Subsystem |
|||
Special WG |
* LCGT Roadmap |
|
Documents |
* public |
Technical Details
TECHNICAL (parameters, simulation codes, etc.)
LCGT Official Documents
Others
Misc. (tools, past discussions, etc.)