Differences between revisions 14 and 98 (spanning 84 versions)
Revision 14 as of 2009-05-09 21:09:14
Size: 492
Editor: whitehole
Comment:
Revision 98 as of 2010-11-03 16:13:26
Size: 1929
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
||[[LCGT|PROJECT]] ||[[LCGT/Meeting|MEETING]] ||[[LCGT/Plans|SCHEDULES&TASKS]] ||[[LCGT/Technical|TECHNICAL]] ||[[LCGT/Links|LINKS]] ||[[LCGT/HowTo|HOWTO]] ||
Line 4: Line 3:
== Project sub group ==
 '''[[LCGT/subgroup|2009年度 推進体制]]'''
 
[[LCGT/subgroup/howtojoin|各サブグループへの参加の仕方]]
=== news ===

 * The next face-to-face meeting is on Feb 4-5th at Kashiwa Campus.
 * LCGT Roadmap meeting has started.

=== Project time-line and iLCGT organization charts ===

[[attachment:timeline.png|{{attachment:timeline.png|Subject to change|width=300}}|width=300]]
[[attachment:organization.png|{{attachment:organization.png|approved on Nov 2nd|width=200}}|width=200]]

 * iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration.
 * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.


=== Links ===
||[[LCGT/Meeting| Meetings]] || * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] || ||Subsystem || [[LCGT/subgroup|iLCGT subsystem wiki]] ||
||Special WG || * [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> * [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> * [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> * [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> * [[JGWDoc/HowTo/UpLoad|how to upload documents]] ||
Line 10: Line 22:
 . [[LCGT/3month_study|2009年 3ヶ月study]]
 . [[LCGT/todo|LCGT to do list]]
=== Technical Details ===
 .[[LCGT/Technical|TECHNICAL]] (parameters, simulation codes, etc.)
[[attachment:sensitivity.png|{{attachment:sensitivity.png|latest sensitivity curve|width=400}}|width=400]]
Line 14: Line 27:
== Wiki How To ==
 * [[newusers|このwikiが初めての方へ]]
=== LCGT Official Documents ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]


----
=== Others ===
 .[[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 .[[newusers|How to use this wiki page]]
 .[[LCGT/old|Old wiki page]]

LCGT wiki

news

  • The next face-to-face meeting is on Feb 4-5th at Kashiwa Campus.
  • LCGT Roadmap meeting has started.

Project time-line and iLCGT organization charts

Subject to change approved on Nov 2nd

  • iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.

Meetings

* Biweekly LCGT meeting
* LCGT f2f meeting

Subsystem

iLCGT subsystem wiki

Special WG

* LCGT Roadmap
* RSE Roadmap
* IFO Bandwidth (~2009)
* SPI study (~2009)

Documents

* public
* internal (password req.)
* how to upload documents


Technical Details

  • TECHNICAL (parameters, simulation codes, etc.)

latest sensitivity curve


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)