773
Comment:
|
1719
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
Now this wiki page is under construction. Old website is [[LCGT/old| here]]. |
|
Line 3: | Line 6: |
== Project sub group == *[[LCGT/subgroup/analysis|解析]] *[[LCGT/subgroup/vacuum|真空装置]] *[[LCGT/subgroup/IFO|干渉計]] *[[LCGT/subgroup/IOO|光学、入出力系]] *[[LCGT/subgroup/lowtemp|低音部]] *[[LCGT/subgroup/mine|坑内整備]] *[[LCGT/subgroup/infrastructure|インフラ]] *[[LCGT/subgroup/seismo|基線伸縮系]] |
=== news === |
Line 13: | Line 8: |
[[LCGT/subgroup/howtojoin|各サブグループへの参加の仕方]] | * The next face-to-face meeting is on Feb 4-5th at Kashiwa Campus. * LCGT Roadmap meeting has started. === Project time-line and iLCGT organization charts === [[attachment:timeline.png|{{attachment:timeline.png|Subject to change|width=300}}|width=300]] [[attachment:organization.png|{{attachment:organization.png|approved on Nov 2nd|width=200}}|width=200]] * iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration. * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration. === Links === ||[[LCGT/Meeting| Meetings]] || * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] || ||Subsystem || [[LCGT/subgroup|Subsystem wiki]] || ||Special WG || * [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> * [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> * [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> * [[LCGT/subgroup/ifo/SPI|SPI study(~2009)]] || ||Documents || * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> * [[JGWDoc/HowTo/UpLoad|How to upload]] || |
Line 16: | Line 25: |
[[LCGT/todo|LCGT to do list]] | === LCGT Official Documents === .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]] .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]] |
Line 19: | Line 31: |
== 外部リンク == *[[http://gw.icrr.u-tokyo.ac.jp:8888/lcgt/|LCGT HP]] *[[http://www.icrr.u-tokyo.ac.jp/gr/LCGT.html|LCGT meetingレポート集]] *[[http://gwproject.mtk.nao.ac.jp/lcgt-archives/table.php?TBLNAME=archive_08|LCGT document archive(password protected)]] |
=== Others === .[[LCGT/miscellaneous|Misc.]] .[[newusers|How to use this wiki page]] |
Now this wiki page is under construction. Old website is here.
LCGT wiki
news
- The next face-to-face meeting is on Feb 4-5th at Kashiwa Campus.
- LCGT Roadmap meeting has started.
Project time-line and iLCGT organization charts
- iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration.
- bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.