Differences between revisions 60 and 93 (spanning 33 versions)
Revision 60 as of 2010-06-20 21:26:53
Size: 1670
Comment:
Revision 93 as of 2010-11-03 15:44:50
Size: 1719
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Now this wiki page is under construction.
Old website is [[LCGT/old| here]].
Line 2: Line 5:
 .[[LCGT/Meeting|定期ミーティング、各ワーキンググループの会議など]]
  * [[LCGT/Meeting/f2f/2010s|Face to face meeting]]
   .日時: 6月15、16日
   .場所: 東大宇宙線研6F大会議室
  * [[LCGT/Meeting/weekly|LCGT meeting]] 毎月第一、第三月曜日14:00~

=== news ===

 * The next face-to-face meeting is on Feb 4-5th at Kashiwa Campus.
 * LCGT Roadmap meeting has started.

=== Project time-line and iLCGT organization charts ===

[[attachment:timeline.png|{{attachment:timeline.png|Subject to change|width=300}}|width=300]]
[[attachment:organization.png|{{attachment:organization.png|approved on Nov 2nd|width=200}}|width=200]]

 * iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration.
 * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.


=== Links ===
||[[LCGT/Meeting| Meetings]] || * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] || ||Subsystem || [[LCGT/subgroup|Subsystem wiki]] ||
||Special WG || * [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> * [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> * [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> * [[LCGT/subgroup/ifo/SPI|SPI study(~2009)]] || ||Documents || * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> * [[JGWDoc/HowTo/UpLoad|How to upload]] ||
Line 9: Line 25:
=== LCGT組織 ===
 .[[http://gw.
icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=121|LCGT推進組織]]
 .[[LCGT/
subgroup|各作業部会へのリンク]]

----
=== LCGT 公式文書
===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT designe document Ver3.0]]
===  LCGT Official Documents ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
Line 17: Line 28:

=== R&D ===
 .[[LCGT/PLUS|2010: R&D plan - PLUS]]
 .[[LCGT/3month_study|2009: 3ヶ月study]]

----
=== 技術面詳細 ===
 .[[LCGT/Technical|TECHNICAL]]
Line 28: Line 31:
=== Document server ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|JGW Doc for public]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|JGW Doc for collaborators]] (internal documents, password required)

 .[[JGWDoc/HowTo/UpLoad|uploadの仕方]]

=== 文書検索 ===
 .[[http://www.google.com/coop/cse?cx=017444024272121679524:7p2pwvc2k2c|重力波検出グループに関する文書検索]]

=== 関連文書 ===
 .[[http://gw.icrr.u-tokyo.ac.jp/lcgt/|LCGT Home Page]]
 .[[http://www.icrr.u-tokyo.ac.jp/gr/LCGT.html|LCGT meetingレポート集]]
 .[[LCGT/nao_archives|NAO ARCHIVES]]

----
=== othres ===
 .[[LCGT/miscellaneous|misc.]]


== Wiki How To ==
 .[[newusers|このwikiが初めての方へ]]
=== Others ===
 .[[LCGT/miscellaneous|Misc.]]
 .[[newusers|How to use this wiki page]]

Now this wiki page is under construction. Old website is here.

LCGT wiki

news

  • The next face-to-face meeting is on Feb 4-5th at Kashiwa Campus.
  • LCGT Roadmap meeting has started.

Project time-line and iLCGT organization charts

Subject to change approved on Nov 2nd

  • iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.

Meetings

* Biweekly LCGT meeting
* LCGT f2f meeting

Subsystem

Subsystem wiki

Special WG

* LCGT Roadmap
* RSE Roadmap
* IFO Bandwidth (~2009)
* SPI study(~2009)

Documents

* public
* internal (password req.)
* How to upload


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)