Differences between revisions 80 and 99 (spanning 19 versions)
Revision 80 as of 2010-10-19 10:46:08
Size: 2052
Editor: YoichiAso
Comment:
Revision 99 as of 2010-11-03 16:13:59
Size: 1804
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 .[[LCGT/Meeting| Periodic Meetings, Working Group Meetings]]<<BR>>(定期ミーティング、各ワーキンググループの会議など)
Line 4: Line 3:
  * [[LCGT/Meeting/f2f/Top|LCGT face to face meeting]]: [[LCGT/Meeting/f2f/2010Sept|September 27-28, 2010]] at [[http://www.icrr.u-tokyo.ac.jp/access/index_eng.html|ICRR Kashiwa campus]] 6F conference room
  * [[LCGT/Meeting/weekly|LCGT meeting]]: Every first and third Tuesday, 8:00JST~
=== Project time-line and iLCGT organization charts ===

[[attachment:timeline.png|{{attachment:timeline.png|Subject to change|width=300}}|width=300]]
[[attachment:organization.png|{{attachment:organization.png|approved on Nov 2nd|width=200}}|width=200]]

 * iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration.
 * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.


=== Links ===
||[[LCGT/Meeting| Meetings]] || * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] || ||Subsystem || [[LCGT/subgroup|iLCGT subsystem wiki]] ||
||Special WG || * [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> * [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> * [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> * [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> * [[JGWDoc/HowTo/UpLoad|how to upload documents]] ||

----
=== Technical Details ===
 .[[LCGT/Technical|TECHNICAL]] (parameters, simulation codes, etc.)
[[attachment:sensitivity.png|{{attachment:sensitivity.png|latest sensitivity curve|width=400}}|width=400]]

----
=== LCGT Official Documents ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]
Line 9: Line 28:
=== LCGT Organization (LCGT組織) ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=121|LCGT Promoting Organization (LCGT推進組織)]]
 .[[LCGT/subgroup|Subsystems and Working Groups (各作業部会へのリンク)]]

----
=== LCGT Official Documents (LCGT 公式文書) ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]

=== R&D ===
 .[[LCGT/PLUS|2010: R&D plan - PLUS]]
 .[[LCGT/3month_study|2009: 3ヶ月study]]

----
=== Technical Details (技術面詳細) ===
 .[[LCGT/Technical|TECHNICAL]]

 .[[LCGT/Terminology|Terminology]]


----
=== Document server ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|JGW Doc for public]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|JGW Doc for collaborators]] (internal documents, password required)

 .[[JGWDoc/HowTo/UpLoad|uploadの仕方]]

=== Document Search (文書検索 ) ===
 .[[http://www.google.com/coop/cse?cx=017444024272121679524:7p2pwvc2k2c|Document search for Japanese GW group (重力波検出グループに関する文書検索)]]

=== Related links (関連文書) ===
 .[[http://gw.icrr.u-tokyo.ac.jp/lcgt/|LCGT Home Page]]
 .[[http://www.icrr.u-tokyo.ac.jp/gr/LCGT.html|LCGT meetingレポート集]]
 .[[LCGT/nao_archives|NAO ARCHIVES]]

----
=== othres ===
 .[[LCGT/miscellaneous|misc.]]


== Wiki How To ==
 .[[newusers|このwikiが初めての方へ]]
=== Others ===
 .[[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 .[[newusers|How to use this wiki page]]
 .[[LCGT/old|Old wiki page]]

LCGT wiki

Project time-line and iLCGT organization charts

Subject to change approved on Nov 2nd

  • iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.

Meetings

* Biweekly LCGT meeting
* LCGT f2f meeting

Subsystem

iLCGT subsystem wiki

Special WG

* LCGT Roadmap
* RSE Roadmap
* IFO Bandwidth (~2009)
* SPI study (~2009)

Documents

* public
* internal (password req.)
* how to upload documents


Technical Details

  • TECHNICAL (parameters, simulation codes, etc.)

latest sensitivity curve


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)