Size: 1721
Comment:
|
Size: 1867
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 21: | Line 21: |
||[[LCGT/Meeting| Meetings]] || * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] || ||Subsystem || [[LCGT/subgroup|Subsystems]] || ||Special WG || * [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> * [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> * [[LCGT/subgroup/ifo/BW|Interferometer Bandwidth (~2009)]] <<BR>> * [[LCGT/subgroup/ifo/SPI|SPI (~2009)]] || ||Documents || * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> * [[JGWDoc/HowTo/UpLoad|How to upload]] || |
||[[LCGT/Meeting| Meetings]] || * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] || ||Subsystem || [[LCGT/subgroup|Subsystem wiki]] || ||Special WG || * [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> * [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> * [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> * [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> * [[JGWDoc/HowTo/UpLoad|how to upload documents]] || ---- === Technical Details === .[[LCGT/Technical|TECHNICAL]] (parameters, simulation codes, etc.) |
Line 32: | Line 36: |
.[[LCGT/miscellaneous|Misc.]] | .[[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.) |
Now this wiki page is under construction. Old website is here.
LCGT wiki
news
- The next face-to-face meeting is on Feb 4-5th at Kashiwa Campus.
- LCGT Roadmap meeting has started.
Project time-line and iLCGT organization charts
- iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration.
- bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.
Links
|
Subsystem |
|||
Special WG |
* LCGT Roadmap |
|
Documents |
* public |
Technical Details
TECHNICAL (parameters, simulation codes, etc.)
LCGT Official Documents
Others
Misc. (tools, past discussions, etc.)