Differences between revisions 98 and 100 (spanning 2 versions)
Revision 98 as of 2010-11-03 16:13:26
Size: 1929
Comment:
Revision 100 as of 2010-11-03 16:17:11
Size: 1893
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

=== news ===

 * The next face-to-face meeting is on Feb 4-5th at Kashiwa Campus.
 * LCGT Roadmap meeting has started.
Line 18: Line 13:
||[[LCGT/Meeting| Meetings]] || * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] || ||Subsystem || [[LCGT/subgroup|iLCGT subsystem wiki]] || ||[[LCGT/Meeting| Meetings]] || * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] || ||Subsystem || * [[LCGT/subgroup|iLCGT subsystem wiki]] <<BR>> * [[LCGT/subgroup2|bLCGT wiki]] <<BR>> * [[LCGT/AIC|advanced-study group wiki]]||

LCGT wiki

Project time-line and iLCGT organization charts

Subject to change approved on Nov 2nd

  • iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.

Meetings

* Biweekly LCGT meeting
* LCGT f2f meeting

Subsystem

* iLCGT subsystem wiki
* bLCGT wiki
* advanced-study group wiki

Special WG

* LCGT Roadmap
* RSE Roadmap
* IFO Bandwidth (~2009)
* SPI study (~2009)

Documents

* public
* internal (password req.)
* how to upload documents


Technical Details

  • TECHNICAL (parameters, simulation codes, etc.)

latest sensitivity curve


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)