= Next Project = == Design == * Electrical connection changed * Design will be fix by the next week * About having oplev and tilt sensor at the same time on one set of pylons - Additional time to investigate necessary * At least MCE will have both oplev and tiltsens at the same time * We will design and make a light wind-sheild * MCO and MCI configuration? Can two sensors be installed at the same time? Keiko will send a picture and Junegyu will check how we can have them * Can oplev QPD and tilt sensor be mounted together - probably difficult. * KK will talk to Miyazawa-san about his question of the channel numbers. == Fabrication == * A small company Kyuman knows can manufacture the sets of tiltsensors for 1.5 Myen. * Seiji will ask if we can buy things from non-Japanese company * 3 sensors for 3 mirrors. No spare. The prototype one we used last time can be reserved as a spare. == Schedule == — fabrication — * Kyuman thinks we can start ordering as soon as the design is fixed * Kyuman and the company together to transfer the technique, which will take some time. * Deliver time will be in the end of August. — installation - - * Sometime in October. * Kyuman can stay for a week, Junegyu can stay for 3 weeks in total. — people — * We will find maybe one student (shift call or what?) * Kirii-kun won’t be able to help due to his master thesis work = Paper = * 5 Hz noise? We could test with also MCI, MCO to see if the other suspensions have the peak or not * Kokeyama will ask Nakano-kun about the co-author (Nakano and Kambara?) * Aim to have a first deadline by the end of April (Junegyu’s deadline 23rd on the experimental part) = Other = *Seiji is visiting Sogang university in May.