Differences between revisions 1 and 2
Revision 1 as of 2018-09-06 10:27:06
Size: 1554
Comment:
Revision 2 as of 2018-09-06 10:44:32
Size: 1957
Comment:
Deletions are marked like this. Additions are marked like this.
Line 39: Line 39:
   *    * Power supplies are OK.
   * Waiting for new post.
  * Rx module alignment
  * TCam has to come back.
   * PC has to be re-installed.
 * AOM current
  * Sometimes over 0.5 V ?
 * Stray light
 * Put dumpers
   * Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20.
 * WSK measurement
  * Modification is required from LIGO's procedure.
  * To be delivered on 9/19 or 20.

Detailed task list of PCal is listed here.

X-end PCal

  • TxPD1 repairing (THS4631 seems broken)
    • Asked Bin-Hua to bring parts.
  • OFS2 closed loop functionality repairing (relay is suspected)
    • Asked Bin-Hua to bring parts.
  • Interlock equippement
    • Switch is equipped to modules.
    • Connector between chassis and laser system is repaired.
  • Unstable D-sub connection at Tx module
    • Some connectors are dead.
  • Cable arrangement
  • Laser remote control
    • PC will be setup.
    • Same script as in Y-end may be applicable.
  • BPM test
    • Picomoter setting
  • Periscope install
    • Wall between duct and modules
      • Ordered. Will arrive Kamioka on 9/10.
    • Set duct and wall.
    • Green laser preparation
      • Power supplies are OK.
      • Waiting for new post.
    • Rx module alignment
    • TCam has to come back.
      • PC has to be re-installed.
  • AOM current
    • Sometimes over 0.5 V ?
  • Stray light
  • Put dumpers
    • Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20.
  • WSK measurement
    • Modification is required from LIGO's procedure.
    • To be delivered on 9/19 or 20.
  • OL/CL TF measurement
  • RPN measurement
  • Laser noise measurement
  • Harmonics noise measurement