⇤ ← Revision 1 as of 2018-09-06 10:27:06
1554
Comment:
|
1957
|
Deletions are marked like this. | Additions are marked like this. |
Line 39: | Line 39: |
* | * Power supplies are OK. * Waiting for new post. * Rx module alignment * TCam has to come back. * PC has to be re-installed. * AOM current * Sometimes over 0.5 V ? * Stray light * Put dumpers * Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20. * WSK measurement * Modification is required from LIGO's procedure. * To be delivered on 9/19 or 20. |
Detailed task list of PCal is listed here.
X-end PCal
- TxPD1 repairing (THS4631 seems broken)
- Asked Bin-Hua to bring parts.
- OFS2 closed loop functionality repairing (relay is suspected)
- Asked Bin-Hua to bring parts.
- Interlock equippement
- Switch is equipped to modules.
- Connector between chassis and laser system is repaired.
- Unstable D-sub connection at Tx module
- Some connectors are dead.
- Cable arrangement
- Laser remote control
- PC will be setup.
- Same script as in Y-end may be applicable.
- BPM test
- Picomoter setting
- Periscope install
- Wall between duct and modules
- Ordered. Will arrive Kamioka on 9/10.
- Set duct and wall.
- Green laser preparation
- Power supplies are OK.
- Waiting for new post.
- Rx module alignment
- TCam has to come back.
- PC has to be re-installed.
- Wall between duct and modules
- AOM current
- Sometimes over 0.5 V ?
- Stray light
- Put dumpers
- Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20.
- WSK measurement
- Modification is required from LIGO's procedure.
- To be delivered on 9/19 or 20.
- OL/CL TF measurement
- RPN measurement
- Laser noise measurement
- Harmonics noise measurement