Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2018-09-06 10:27:06
Size: 1554
Comment:
Revision 3 as of 2018-09-06 11:18:16
Size: 2228
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
 * TxPD1 repairing (THS4631 seems broken)  * TxPD1 repairing
  *
THS4631 seems broken
Line 21: Line 22:
 * OFS2 closed loop functionality repairing (relay is suspected)  * OFS2 closed loop functionality repairing
  * R
elay is suspected. Will confirm using tester.
Line 35: Line 37:
  * Equip picomoters to the mirror
Line 39: Line 42:
   *    * Power supplies are OK.
   * Waiting for new post.
  * Rx module alignment
  * TCam has to come back.
   * PC has to be re-installed.
 * AOM current
  * Sometimes over 0.5 V ?
 * Stray light
 * Put dumpers
   * Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20.
 * WSK measurement
  * Alignment of the last 2 mirrors ()
  * Modification is required from LIGO's procedure.
  * To be delivered on 9/19 or 20.
 * DAC noise problem
  * With DAC cable, very large noise and offset are observed. It may be difficult to set working point.
Line 44: Line 62:
 * VGA noise measurement
 

Detailed task list of PCal is listed here.

X-end PCal

  • TxPD1 repairing
    • THS4631 seems broken
    • Asked Bin-Hua to bring parts.
  • OFS2 closed loop functionality repairing
    • Relay is suspected. Will confirm using tester.
    • Asked Bin-Hua to bring parts.
  • Interlock equippement
    • Switch is equipped to modules.
    • Connector between chassis and laser system is repaired.
  • Unstable D-sub connection at Tx module
    • Some connectors are dead.
  • Cable arrangement
  • Laser remote control
    • PC will be setup.
    • Same script as in Y-end may be applicable.
  • BPM test
    • Picomoter setting
  • Periscope install
    • Equip picomoters to the mirror
    • Wall between duct and modules
      • Ordered. Will arrive Kamioka on 9/10.
    • Set duct and wall.
    • Green laser preparation
      • Power supplies are OK.
      • Waiting for new post.
    • Rx module alignment
    • TCam has to come back.
      • PC has to be re-installed.
  • AOM current
    • Sometimes over 0.5 V ?
  • Stray light
  • Put dumpers
    • Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20.
  • WSK measurement
    • Alignment of the last 2 mirrors ()
    • Modification is required from LIGO's procedure.
    • To be delivered on 9/19 or 20.
  • DAC noise problem
    • With DAC cable, very large noise and offset are observed. It may be difficult to set working point.
  • OL/CL TF measurement
  • RPN measurement
  • Laser noise measurement
  • Harmonics noise measurement
  • VGA noise measurement