Differences between revisions 10 and 16 (spanning 6 versions)
Revision 10 as of 2018-09-06 11:54:50
Size: 2880
Comment:
Revision 16 as of 2018-09-20 16:16:16
Size: 2612
Comment:
Deletions are marked like this. Additions are marked like this.
Line 19: Line 19:
Urgent
Line 20: Line 22:
  * THS4631 seems broken
  * Asked Bin-Hua to bring parts.
  * Repaired. To be checked.
Line 23: Line 24:
  * Relay is suspected. Will confirm using tester.
  * Asked Bin-Hua to bring parts.
 * Interlock equipment
  * Switch is equipped to modules.
  * Connector between chassis and laser system is repaired.
 * Check DAC input between MEDM and actual
 * Unstable D-sub connection at Tx module
  * Some connectors are dead.
 * Cable arrangement
  * Relay is OK. Investigating the cause.
 * DAC noise problem
  * With DAC cable, very large noise and offset are observed. It may be difficult to set working point.

2nd-urgent

 * DAC input bias between MEDM and actual
Line 33: Line 32:
  * PC will be setup.
  * Same script as in Y-end may be applicable.
 * BPM test
  * Picomoter setting
 * Periscope install
  * Equip picomoters to the mirror
  * Wall between duct and modules
   * Ordered. Will arrive Kamioka on 9/10.
  * Set duct and wall.
  * Green laser preparation
   * Power supplies are OK.
   * Waiting for new post.
  * Rx module alignment
  * TCam has to come back.
   * PC has to be re-installed.
 * AOM current
  * Sometimes over 0.5 V ?
  * Setup done. LAN cable should be replaced to shorter one.
Line 53: Line 36:
 * WSK measurement
  * Alignment of the last 2 mirrors (Accidentally moved)
  * Modification is required from LIGO's procedure.
  * Code for WSK measurement analysis
  * To be delivered on 9/19 or 20.
  * May have to prepare voltage calibrator to calibrate readout by DGS.
 * DAC noise problem
  * With DAC cable, very large noise and offset are observed. It may be difficult to set working point.
 * Take care about grounding

~9/11

 * Periscope install
  * Equip picomoters to the mirror

~10/3
 * Complete periscope install
 * Rx module alignment

~10/20 first test to inject PCal laser to the X-end test mass
Line 65: Line 51:
 * WSK measurement
  * Modification is required from LIGO's procedure.
  * Code for WSK measurement analysis
  * To be delivered on 9/19 or 20 to Toyama Univ.
  * May have to prepare voltage calibrator to calibrate readout by DGS.

~X-arm commissioning line injection

 * BPM test
  * Picomoter setting
 * Preparation for X-arm commissioning calibration line injection

~O3
Line 74: Line 74:

 * Unstable D-sub connection at Tx module
  * Some connectors are dead.
 * Cable arrangement
Line 75: Line 79:
 * Preparation for X-arm commissioning calibration line injection  * Operation tool preparation
Line 77: Line 81:
Bonus work

 * AOM current
  * Sometimes over 0.5 V ?
 * Take care about grounding
Line 78: Line 87:
 * Operation tool preparation
Pre-categorization

Detailed task list of PCal is listed here.

X-end PCal

Urgent

  • TxPD1 repairing
    • Repaired. To be checked.
  • OFS2 closed loop functionality repairing
    • Relay is OK. Investigating the cause.
  • DAC noise problem
    • With DAC cable, very large noise and offset are observed. It may be difficult to set working point.

2nd-urgent

  • DAC input bias between MEDM and actual
  • Laser remote control
    • Setup done. LAN cable should be replaced to shorter one.
  • Stray light
    • Put dumpers
      • Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20.

~9/11

  • Periscope install
    • Equip picomoters to the mirror

~10/3

  • Complete periscope install
  • Rx module alignment

~10/20 first test to inject PCal laser to the X-end test mass

  • AOM response measurement
    • Check working point is consistent to that in KEK
  • OL/CL TF measurement
  • WSK measurement
    • Modification is required from LIGO's procedure.
    • Code for WSK measurement analysis
    • To be delivered on 9/19 or 20 to Toyama Univ.
    • May have to prepare voltage calibrator to calibrate readout by DGS.

~X-arm commissioning line injection

  • BPM test
    • Picomoter setting
  • Preparation for X-arm commissioning calibration line injection

~O3

  • RPN measurement
  • Laser noise measurement
  • Harmonics noise measurement
  • VGA noise measurement
  • Excitation noise measurement
  • Peak stability test
  • Shot noise
  • Offset input noise
  • Noise model
  • Unstable D-sub connection at Tx module
    • Some connectors are dead.
  • Cable arrangement
  • OFS upgrade
  • Operation tool preparation

Bonus work

  • AOM current
    • Sometimes over 0.5 V ?
  • Take care about grounding
  • Initial laser power just after turned on seems too small ?

Pre-categorization

Y-end PCal

Laser power calibration setting in Toyama Univ.

PcalTask (last edited 2018-11-22 09:41:33 by chihiro.kozakai)