Line 20: Line 20:

* TxPD1 repairing
  * THS4631 seems broken
* Ordering parts.
 * RxPD1 repairing
  * 2 ICs seems broken. ICs have arrived at Kamioka.
Line 25: Line 23:
  * Relay is OK. Investigating the cause.
  * Asked Bin-Hua to bring relay.
 * DAC noise problem
  * With DAC cable, very large noise and offset are observed. It may be difficult to set working point.
  * Register is missing. To be delivered.
 * Interlock repairing
Line 32: Line 28:
 * DAC input bias between MEDM and actual
Line 34: Line 29:
  * PC will be setup.
  * Same script as in Y-end may be applicable.
  * Setup done. LAN cable should be replaced to shorter one.
Line 38: Line 32:
   * Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20.
 * WSK measurement
  * Alignment of the last 2 mirrors (Accidentally moved)
  * Modification is required from LIGO's procedure.
  * Code for WSK measurement analysis
  * To be delivered on 9/19 or 20.
  * May have to prepare voltage calibrator to calibrate readout by DGS.
Line 46: Line 33:
~9/11 ~10/20 first test to inject PCal laser to the X-end test mass
Line 48: Line 35:
 * Periscope install
  * Equip picomoters to the mirror
  * Wall between duct and modules
   * Ordered. Will arrive Kamioka on 9/11.
  * Set duct and wall.
  * Green laser preparation
   * Power supplies are OK.
   * New post arrived. To be set.
  * TCam has to come back.
   * PC has to be re-installed.

~JPS meeting 9/14
 * Rx module alignment
Line 64: Line 39:
 * WSK measurement
  * Modification is required from LIGO's procedure.
  * Code for WSK measurement analysis
  * To be delivered on 9/19 or 20 to Toyama Univ.
  * May have to prepare voltage calibrator to calibrate readout by DGS.

~X-arm commissioning line injection

 * BPM test
  * Picomoter setting
 * Preparation for X-arm commissioning calibration line injection

~O3
Line 73: Line 62:

~9/28
 * Complete periscope install
 * Rx module alignment

~X-arm commissioning line injection

 * BPM test
  * Picomoter setting
 * Preparation for X-arm commissioning calibration line injection

~O3

Detailed task list of PCal is listed here.

X-end PCal

Urgent

  • RxPD1 repairing
    • 2 ICs seems broken. ICs have arrived at Kamioka.
  • OFS2 closed loop functionality repairing
    • Register is missing. To be delivered.
  • Interlock repairing

2nd-urgent

  • Laser remote control
    • Setup done. LAN cable should be replaced to shorter one.
  • Stray light
    • Put dumpers

~10/20 first test to inject PCal laser to the X-end test mass

  • Rx module alignment
  • AOM response measurement
    • Check working point is consistent to that in KEK
  • OL/CL TF measurement
  • WSK measurement
    • Modification is required from LIGO's procedure.
    • Code for WSK measurement analysis
    • To be delivered on 9/19 or 20 to Toyama Univ.
    • May have to prepare voltage calibrator to calibrate readout by DGS.

~X-arm commissioning line injection

  • BPM test
    • Picomoter setting
  • Preparation for X-arm commissioning calibration line injection

~O3

  • RPN measurement
  • Laser noise measurement
  • Harmonics noise measurement
  • VGA noise measurement
  • Excitation noise measurement
  • Peak stability test
  • Shot noise
  • Offset input noise
  • Noise model
  • Unstable D-sub connection at Tx module
    • Some connectors are dead.
  • Cable arrangement
  • OFS upgrade
  • Operation tool preparation

Bonus work

  • AOM current
    • Sometimes over 0.5 V ?
  • Take care about grounding
  • Initial laser power just after turned on seems too small ?

Pre-categorization

Y-end PCal

Laser power calibration setting in Toyama Univ.