* 2 ICs seems broken. * OFS2 closed loop functionality repairing * Relay is OK. Investigating the cause. * DAC noise problem * With DAC cable, very large noise and offset are observed. It may be difficult to set working point. |
* Repaired but not tested. |
Line 30: | Line 25: |
* DAC input bias between MEDM and actual * Laser remote control * Setup done. LAN cable should be replaced to shorter one. |
|
Line 35: | Line 27: |
~10/3 * Complete periscope install * Rx module alignment |
* Module wall will be black coated. |
Line 42: | Line 31: |
* Rx module alignment * After vacuuming and ETMX alignment by commissioning team. |
|
Line 43: | Line 34: |
* Check working point is consistent to that in KEK | * Done. To be checked periodically. |
Line 48: | Line 39: |
* To be delivered on 9/19 or 20 to Toyama Univ. * May have to prepare voltage calibrator to calibrate readout by DGS. |
* X-end Tx calibration is done. * May have to prepare voltage calibrator to calibrate readout by DGS ? |
Line 54: | Line 45: |
* Picomoter setting | * Waiting for ETMX alignemnt |
Detailed task list of PCal is listed here.
X-end PCal
Urgent
- RxPD1 repairing
- Repaired but not tested.
2nd-urgent
- Stray light
- Put dumpers
- Module wall will be black coated.
~10/20 first test to inject PCal laser to the X-end test mass
- Rx module alignment
- After vacuuming and ETMX alignment by commissioning team.
- AOM response measurement
- Done. To be checked periodically.
- OL/CL TF measurement
- WSK measurement
- Modification is required from LIGO's procedure.
- Code for WSK measurement analysis
- X-end Tx calibration is done.
- May have to prepare voltage calibrator to calibrate readout by DGS ?
~X-arm commissioning line injection
- BPM test
- Waiting for ETMX alignemnt
- Preparation for X-arm commissioning calibration line injection
~O3
- RPN measurement
- Laser noise measurement
- Harmonics noise measurement
- VGA noise measurement
- Excitation noise measurement
- Peak stability test
- Shot noise
- Offset input noise
- Noise model
- Unstable D-sub connection at Tx module
- Some connectors are dead.
- Cable arrangement
- OFS upgrade
- Operation tool preparation
Bonus work
- AOM current
- Sometimes over 0.5 V ?
- Take care about grounding
- Initial laser power just after turned on seems too small ?
Pre-categorization
Y-end PCal