Line 17: Line 17:
X-end PCal = X-end PCal =
Line 19: Line 19:
 * TxPD1 repairing (THS4631 seems broken)
  * Asked Bin-Hua to bring parts.
 * OFS2 closed loop functionality repairing (relay is suspected)
  * Asked Bin-Hua to bring parts.
 * Interlock equippement
  * Switch is equipped to modules.
  * Connector between chassis and laser system is repaired.
Urgent

 * TxPD1 repairing
  * Repaired. To be checked.
 * OFS2 closed loop functionality repairing
  * Relay is OK. Investigating the cause.
 * DAC noise problem
  * With DAC cable, very large noise and offset are observed. It may be difficult to set working point.

2nd-urgent

 * DAC input bias between MEDM and actual
 * Laser remote control
  * Setup done. LAN cable should be replaced to shorter one.
 * Stray light
  * Put dumpers
   * Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20.

~9/11

 * Periscope install
  * Equip picomoters to the mirror

~10/3
 * Complete periscope install
 * Rx module alignment

~10/20 first test to inject PCal laser to the X-end test mass

 * AOM response measurement
  * Check working point is consistent to that in KEK
 * OL/CL TF measurement
 * WSK measurement
  * Modification is required from LIGO's procedure.
  * Code for WSK measurement analysis
  * To be delivered on 9/19 or 20 to Toyama Univ.
  * May have to prepare voltage calibrator to calibrate readout by DGS.

~X-arm commissioning line injection

 * BPM test
  * Picomoter setting
 * Preparation for X-arm commissioning calibration line injection

~O3

 * RPN measurement
 * Laser noise measurement
 * Harmonics noise measurement
 * VGA noise measurement
 * Excitation noise measurement
 * Peak stability test
 * Shot noise
 * Offset input noise
 * Noise model
Line 29: Line 78:
 * Laser remote control
  * PC will be setup.
  * Same script as in Y-end may be applicable.
 * BPM test
  * Picomoter setting
 * Periscope install
  * Wall between duct and modules
   * Ordered. Will arrive Kamioka on 9/10.
  * Set duct and wall.
  * Green laser preparation
   * Power supplies are OK.
   * Waiting for new post.
  * Rx module alignment
  * TCam has to come back.
   * PC has to be re-installed.
 * OFS upgrade
 * Operation tool preparation

Bonus work
Line 46: Line 85:
 * Stray light
 * Put dumpers
   * Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20.
 * WSK measurement
  * Modification is required from LIGO's procedure.
  * To be delivered on 9/19 or 20.
 * OL/CL TF measurement
 * RPN measurement
 * Laser noise measurement
 * Harmonics noise measurement
 * Take care about grounding
 * Initial laser power just after turned on seems too small ?

Pre-categorization


= Y-end PCal =

= Laser power calibration setting in Toyama Univ. =
 

Detailed task list of PCal is listed here.

X-end PCal

Urgent

  • TxPD1 repairing
    • Repaired. To be checked.
  • OFS2 closed loop functionality repairing
    • Relay is OK. Investigating the cause.
  • DAC noise problem
    • With DAC cable, very large noise and offset are observed. It may be difficult to set working point.

2nd-urgent

  • DAC input bias between MEDM and actual
  • Laser remote control
    • Setup done. LAN cable should be replaced to shorter one.
  • Stray light
    • Put dumpers
      • Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20.

~9/11

  • Periscope install
    • Equip picomoters to the mirror

~10/3

  • Complete periscope install
  • Rx module alignment

~10/20 first test to inject PCal laser to the X-end test mass

  • AOM response measurement
    • Check working point is consistent to that in KEK
  • OL/CL TF measurement
  • WSK measurement
    • Modification is required from LIGO's procedure.
    • Code for WSK measurement analysis
    • To be delivered on 9/19 or 20 to Toyama Univ.
    • May have to prepare voltage calibrator to calibrate readout by DGS.

~X-arm commissioning line injection

  • BPM test
    • Picomoter setting
  • Preparation for X-arm commissioning calibration line injection

~O3

  • RPN measurement
  • Laser noise measurement
  • Harmonics noise measurement
  • VGA noise measurement
  • Excitation noise measurement
  • Peak stability test
  • Shot noise
  • Offset input noise
  • Noise model
  • Unstable D-sub connection at Tx module
    • Some connectors are dead.
  • Cable arrangement
  • OFS upgrade
  • Operation tool preparation

Bonus work

  • AOM current
    • Sometimes over 0.5 V ?
  • Take care about grounding
  • Initial laser power just after turned on seems too small ?

Pre-categorization

Y-end PCal

Laser power calibration setting in Toyama Univ.