Size: 1957
Comment:
|
Size: 2405
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 19: | Line 19: |
* TxPD1 repairing (THS4631 seems broken) | * TxPD1 repairing * THS4631 seems broken |
Line 21: | Line 22: |
* OFS2 closed loop functionality repairing (relay is suspected) | * OFS2 closed loop functionality repairing * Relay is suspected. Will confirm using tester. |
Line 23: | Line 25: |
* Interlock equippement | * Interlock equipment |
Line 35: | Line 37: |
* Equip picomoters to the mirror | |
Line 47: | Line 50: |
* Put dumpers | * Put dumpers |
Line 50: | Line 53: |
* Alignment of the last 2 mirrors (Accidentally moved) | |
Line 51: | Line 55: |
* Code for WSK measurement analysis | |
Line 52: | Line 57: |
* May have to prepare voltage calibrator to calibrate readout by DGS. * DAC noise problem * With DAC cable, very large noise and offset are observed. It may be difficult to set working point. |
|
Line 56: | Line 64: |
* VGA noise measurement * Excitation noise measurement * Noise model |
Detailed task list of PCal is listed here.
X-end PCal
- TxPD1 repairing
- THS4631 seems broken
- Asked Bin-Hua to bring parts.
- OFS2 closed loop functionality repairing
- Relay is suspected. Will confirm using tester.
- Asked Bin-Hua to bring parts.
- Interlock equipment
- Switch is equipped to modules.
- Connector between chassis and laser system is repaired.
- Unstable D-sub connection at Tx module
- Some connectors are dead.
- Cable arrangement
- Laser remote control
- PC will be setup.
- Same script as in Y-end may be applicable.
- BPM test
- Picomoter setting
- Periscope install
- Equip picomoters to the mirror
- Wall between duct and modules
- Ordered. Will arrive Kamioka on 9/10.
- Set duct and wall.
- Green laser preparation
- Power supplies are OK.
- Waiting for new post.
- Rx module alignment
- TCam has to come back.
- PC has to be re-installed.
- AOM current
- Sometimes over 0.5 V ?
- Stray light
- Put dumpers
- Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20.
- Put dumpers
- WSK measurement
- Alignment of the last 2 mirrors (Accidentally moved)
- Modification is required from LIGO's procedure.
- Code for WSK measurement analysis
- To be delivered on 9/19 or 20.
- May have to prepare voltage calibrator to calibrate readout by DGS.
- DAC noise problem
- With DAC cable, very large noise and offset are observed. It may be difficult to set working point.
- OL/CL TF measurement
- RPN measurement
- Laser noise measurement
- Harmonics noise measurement
- VGA noise measurement
- Excitation noise measurement
- Noise model