* RxPD1 repairing * 2 ICs seems broken. ICs have arrived at Kamioka. * OFS2 closed loop functionality repairing * Register is missing. To be delivered. |
* Excitation port noise |
Line 27: | Line 24: |
* Laser remote control * Setup done. LAN cable should be replaced to shorter one. |
|
Line 30: | Line 25: |
* Tx PDs detect light even if the AOM input is almost 0. | |
Line 32: | Line 28: |
~10/20 first test to inject PCal laser to the X-end test mass | ~11/3 first test to inject PCal laser to the X-end test mass |
Line 35: | Line 31: |
* AOM response measurement * Check working point is consistent to that in KEK |
* QPD alignment |
Line 38: | Line 33: |
* WSK measurement * Modification is required from LIGO's procedure. * Code for WSK measurement analysis * To be delivered on 9/19 or 20 to Toyama Univ. * May have to prepare voltage calibrator to calibrate readout by DGS. |
* OFS board gain seems strange. Saturation around 13 dB. * Strange bump in AA/AI (~6 kHz) |
Line 47: | Line 39: |
* Picomoter setting | |
Line 49: | Line 40: |
* Guardian | |
Line 57: | Line 49: |
* DGS part seems not noisy, but cause large noise when connected to the OFS. | |
Line 64: | Line 57: |
* Cable arrangement | |
Line 73: | Line 65: |
* Initial laser power just after turned on seems too small ? | |
Line 80: | Line 71: |
* Periscope re-installation |
|
Line 82: | Line 75: |
~Y-arm commissioning * Prepare cross calibration setup and calibrate an integrating sphere |
Detailed task list of PCal is listed here.
X-end PCal
Urgent
- Excitation port noise
2nd-urgent
- Stray light
- Tx PDs detect light even if the AOM input is almost 0.
- Put dumpers
~11/3 first test to inject PCal laser to the X-end test mass
- Rx module alignment
- QPD alignment
- OL/CL TF measurement
- OFS board gain seems strange. Saturation around 13 dB.
- Strange bump in AA/AI (~6 kHz)
~X-arm commissioning line injection
- BPM test
- Preparation for X-arm commissioning calibration line injection
- Guardian
~O3
- RPN measurement
- Laser noise measurement
- Harmonics noise measurement
- VGA noise measurement
- Excitation noise measurement
- DGS part seems not noisy, but cause large noise when connected to the OFS.
- Peak stability test
- Shot noise
- Offset input noise
- Noise model
- Unstable D-sub connection at Tx module
- Some connectors are dead.
- OFS upgrade
- Operation tool preparation
Bonus work
- AOM current
- Sometimes over 0.5 V ?
- Take care about grounding
Pre-categorization
Y-end PCal
- Periscope re-installation
Laser power calibration setting in Toyama Univ.
~Y-arm commissioning
- Prepare cross calibration setup and calibrate an integrating sphere