Line 22: Line 22:
 * OFS2 closed loop functionality repairing
  * Register is missing. To be delivered.
 * Interlock repairing
Line 28: Line 25:
 * Laser remote control
  * Setup done. LAN cable should be replaced to shorter one.
Line 32: Line 27:
  * Module wall will be black coated.
Line 38: Line 34:
  * Check working point is consistent to that in KEK   * Done. To be checked periodically.
Line 43: Line 39:
  * It is at Toyama Univ.
  * May have to prepare voltage calibrator to calibrate readout by DGS.
  * X-end Tx calibration is done.
  * May have to prepare voltage calibrator to calibrate readout by DGS ?
Line 49: Line 45:
  * Picomoter setting   * Waiting for ETMX alignemnt

Detailed task list of PCal is listed here.

X-end PCal

Urgent

  • RxPD1 repairing
    • Repaired but not tested.

2nd-urgent

  • Stray light
    • Put dumpers
    • Module wall will be black coated.

~10/20 first test to inject PCal laser to the X-end test mass

  • Rx module alignment
    • After vacuuming and ETMX alignment by commissioning team.
  • AOM response measurement
    • Done. To be checked periodically.
  • OL/CL TF measurement
  • WSK measurement
    • Modification is required from LIGO's procedure.
    • Code for WSK measurement analysis
    • X-end Tx calibration is done.
    • May have to prepare voltage calibrator to calibrate readout by DGS ?

~X-arm commissioning line injection

  • BPM test
    • Waiting for ETMX alignemnt
  • Preparation for X-arm commissioning calibration line injection

~O3

  • RPN measurement
  • Laser noise measurement
  • Harmonics noise measurement
  • VGA noise measurement
  • Excitation noise measurement
  • Peak stability test
  • Shot noise
  • Offset input noise
  • Noise model
  • Unstable D-sub connection at Tx module
    • Some connectors are dead.
  • Cable arrangement
  • OFS upgrade
  • Operation tool preparation

Bonus work

  • AOM current
    • Sometimes over 0.5 V ?
  • Take care about grounding
  • Initial laser power just after turned on seems too small ?

Pre-categorization

Y-end PCal

Laser power calibration setting in Toyama Univ.