Line 20: Line 20:
 * RxPD1 repairing
  * Repaired but not tested.
 * Excitation port noise
Line 26: Line 25:
  * Tx PDs detect light even if the AOM input is almost 0.
Line 27: Line 27:
  * Module wall will be black coated.
Line 29: Line 28:
~10/20 first test to inject PCal laser to the X-end test mass ~11/3 first test to inject PCal laser to the X-end test mass
Line 32: Line 31:
  * After vacuuming and ETMX alignment by commissioning team.
 * AOM response measurement
  * Done. To be checked periodically.
  * QPD alignment
Line 36: Line 33:
 * WSK measurement
  * Modification is required from LIGO's procedure.
  * Code for WSK measurement analysis
  * X-end Tx calibration is done.
  * May have to prepare voltage calibrator to calibrate readout by DGS ?
  * OFS board gain seems strange. Saturation around 13 dB.
  * Strange bump in AA/AI (~6 kHz)
Line 45: Line 39:
  * Waiting for ETMX alignemnt
Line 47: Line 40:
  * Guardian
Line 55: Line 49:
  * DGS part seems not noisy, but cause large noise when connected to the OFS.
Line 62: Line 57:
 * Cable arrangement
Line 71: Line 65:
 * Initial laser power just after turned on seems too small ?
Line 78: Line 71:
 * Periscope re-installation
Line 80: Line 75:
~Y-arm commissioning

 * Prepare cross calibration setup and calibrate an integrating sphere

Detailed task list of PCal is listed here.

X-end PCal

Urgent

  • Excitation port noise

2nd-urgent

  • Stray light
    • Tx PDs detect light even if the AOM input is almost 0.
    • Put dumpers

~11/3 first test to inject PCal laser to the X-end test mass

  • Rx module alignment
    • QPD alignment
  • OL/CL TF measurement
    • OFS board gain seems strange. Saturation around 13 dB.
    • Strange bump in AA/AI (~6 kHz)

~X-arm commissioning line injection

  • BPM test
  • Preparation for X-arm commissioning calibration line injection
    • Guardian

~O3

  • RPN measurement
  • Laser noise measurement
  • Harmonics noise measurement
  • VGA noise measurement
  • Excitation noise measurement
    • DGS part seems not noisy, but cause large noise when connected to the OFS.
  • Peak stability test
  • Shot noise
  • Offset input noise
  • Noise model
  • Unstable D-sub connection at Tx module
    • Some connectors are dead.
  • OFS upgrade
  • Operation tool preparation

Bonus work

  • AOM current
    • Sometimes over 0.5 V ?
  • Take care about grounding

Pre-categorization

Y-end PCal

  • Periscope re-installation

Laser power calibration setting in Toyama Univ.

~Y-arm commissioning

  • Prepare cross calibration setup and calibrate an integrating sphere