Line 19: | Line 19: |
* TxPD1 repairing * THS4631 seems broken * Asked Bin-Hua to bring parts. |
Urgent * RxPD1 repairing * Repaired but not tested. |
Line 23: | Line 23: |
* Relay is suspected. Will confirm using tester. * Asked Bin-Hua to bring parts. * Interlock equipment * Switch is equipped to modules. * Connector between chassis and laser system is repaired. * Unstable D-sub connection at Tx module * Some connectors are dead. * Cable arrangement |
* Register is missing. To be delivered. * Interlock repairing 2nd-urgent |
Line 32: | Line 29: |
* PC will be setup. * Same script as in Y-end may be applicable. |
* Setup done. LAN cable should be replaced to shorter one. * Stray light * Put dumpers ~10/20 first test to inject PCal laser to the X-end test mass * Rx module alignment * After vacuuming and ETMX alignment by commissioning team. * AOM response measurement * Check working point is consistent to that in KEK * OL/CL TF measurement * WSK measurement * Modification is required from LIGO's procedure. * Code for WSK measurement analysis * It is at Toyama Univ. * May have to prepare voltage calibrator to calibrate readout by DGS. ~X-arm commissioning line injection |
Line 36: | Line 50: |
* Periscope install * Equip picomoters to the mirror * Wall between duct and modules * Ordered. Will arrive Kamioka on 9/10. * Set duct and wall. * Green laser preparation * Power supplies are OK. * Waiting for new post. * Rx module alignment * TCam has to come back. * PC has to be re-installed. * AOM current * Sometimes over 0.5 V ? * Stray light * Put dumpers * Borrowing 2 from Toyama univ. They has to be returned on 9/19 or 20. * WSK measurement * Alignment of the last 2 mirrors (Accidentally moved) * Modification is required from LIGO's procedure. * Code for WSK measurement analysis * To be delivered on 9/19 or 20. * May have to prepare voltage calibrator to calibrate readout by DGS. * DAC noise problem * With DAC cable, very large noise and offset are observed. It may be difficult to set working point. * Take care about grounding * OL/CL TF measurement |
* Preparation for X-arm commissioning calibration line injection ~O3 |
Line 67: | Line 59: |
* Peak stability test * Shot noise * Offset input noise |
|
Line 68: | Line 63: |
* Unstable D-sub connection at Tx module * Some connectors are dead. * Cable arrangement |
|
Line 69: | Line 68: |
* Operation tool preparation Bonus work * AOM current * Sometimes over 0.5 V ? * Take care about grounding * Initial laser power just after turned on seems too small ? Pre-categorization |
|
Line 71: | Line 80: |
=Laser power calibration setting in Toyama Univ.= | = Y-end PCal = = Laser power calibration setting in Toyama Univ. = |
Detailed task list of PCal is listed here.
X-end PCal
Urgent
- RxPD1 repairing
- Repaired but not tested.
- OFS2 closed loop functionality repairing
- Register is missing. To be delivered.
- Interlock repairing
2nd-urgent
- Laser remote control
- Setup done. LAN cable should be replaced to shorter one.
- Stray light
- Put dumpers
~10/20 first test to inject PCal laser to the X-end test mass
- Rx module alignment
- After vacuuming and ETMX alignment by commissioning team.
- AOM response measurement
- Check working point is consistent to that in KEK
- OL/CL TF measurement
- WSK measurement
- Modification is required from LIGO's procedure.
- Code for WSK measurement analysis
- It is at Toyama Univ.
- May have to prepare voltage calibrator to calibrate readout by DGS.
~X-arm commissioning line injection
- BPM test
- Picomoter setting
- Preparation for X-arm commissioning calibration line injection
~O3
- RPN measurement
- Laser noise measurement
- Harmonics noise measurement
- VGA noise measurement
- Excitation noise measurement
- Peak stability test
- Shot noise
- Offset input noise
- Noise model
- Unstable D-sub connection at Tx module
- Some connectors are dead.
- Cable arrangement
- OFS upgrade
- Operation tool preparation
Bonus work
- AOM current
- Sometimes over 0.5 V ?
- Take care about grounding
- Initial laser power just after turned on seems too small ?
Pre-categorization
Y-end PCal