Differences between revisions 3 and 14 (spanning 11 versions)
Revision 3 as of 2010-04-14 14:27:35
Size: 292
Comment:
Revision 14 as of 2010-04-18 18:12:55
Size: 1237
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
'''[[TAMA/Plans/Fy2009-3q|2009 3rd-4th quarter: Mach-Zehnder Related]]''' >>> '''[[TAMA/Plans/Fy2009-3q|2009 3rd quarter: TAMA RSE ground-design]]'''

>>> '''[[TAMA/Plans/Fy2009-4q|2009
4th quarter: Mach-Zehnder Related]]'''
Line 6: Line 8:
== Check List ==
'''|| Task || Module || Design || Parts Order || Soldering || Assemble || Test || Install ||'''
|| MZ || Beam profile || Design || ;-) || Soldering || Assemble || Test || Install ||
|| RF || LO dist || :D || /!\ || Soldering || Assemble || Test || Install ||
|| RF || RF PD ver3 || :D || Parts Order || Soldering || Assemble || Test || Install ||
|| RF || RF PD ver4 || :D || Parts Order || Soldering || Assemble || Test || Install ||
|| RF || I-Q demod || /!\ || Parts Order || Soldering || Assemble || Test || Install ||
Line 9: Line 19:
 * [[attachment:Review_LCGT_demod.pdf|Demodulator review for LCGT design]]
 * [[attachment:part_list_IQdemod.pdf|I-Q demodulator parts list & 見積書]]

>>> 2009 3rd quarter: TAMA RSE ground-design

>>> 2009 4th quarter: Mach-Zehnder Related

ToDo List

TAMA_2010Apr.png

Check List

|| Task || Module || Design || Parts Order || Soldering || Assemble || Test || Install ||

MZ

Beam profile

Design

;-)

Soldering

Assemble

Test

Install

RF

LO dist

:D

/!\

Soldering

Assemble

Test

Install

RF

RF PD ver3

:D

Parts Order

Soldering

Assemble

Test

Install

RF

RF PD ver4

:D

Parts Order

Soldering

Assemble

Test

Install

RF

I-Q demod

/!\

Parts Order

Soldering

Assemble

Test

Install

RF circuits

Digital Control

  • DSP based servo module assemble (2 sets)

TAMA/Plans/FY2010-1q (last edited 2010-04-18 18:19:53 by DaisukeTatsumi)