Check list for vacuum test in the Center area

Schedule


Check items

Each item should have following format;

Once the item has been checked, it will be like:


Alignment

Preparation of monitors during pump down

Other checks before pump down

Checks during pump down

Connection status (Uchiyama)

KAGRA/Commissioning/Phase1/Task/CheckList/20180307_VacuumCenter/図2_180208_中央真空系.png

GVmc

IFI

IMM

PRM

PR3

PR2

BS

GVbsx

BS

GVbsy

BS

以下、VIS,IOOに他に閉めるべきフランジがないかどうか確認してもらって作ったリスト

真空引き開始前後から冷却開始まで (木村)