(1) ADS for ETMXY using common/differential scheme succeeded.

(2) SAF/FCL work is scheduled in the morning.

(3) PEM work is scheduled in the morning.

(4) CAL work for pre-observation will be done in this morning.

(5) Model loading will be done.

(6) ASC will be tried until 16:00 after CAL work. Optical setting for ASC on the AS table was recovered yesterday.

(7) Observation will start at 17:00.