Suspension Condition of IMMT1/2. (Takahashi, Ushiba)
IMMT1/2
- Mechanical Motion
- Smooth pico motion and its default position
- Gaps between magnets and coils
Gaps between EQ stoppers and mirrors -> confirmed less than 1mm.
- Smooth pico motion and its default position
- Electrical wirings
Coil resistances and inductances ->
Isolation of Wiring from coils to flanges(pico and mag-coil) ->
- Fixing on tables is tight and reliable?
- Smooth Mag-coil motion and balance and TFs
- Mirror conditions(??)
- Clean around the center?
- Clean around the center?
- Beam dump(T.Akutsu)
- Beam shield
- Beam dumps were additionally added?
- In basic, No. Relocation was done.
- Beam shield
Beam Path from IMC to PRM (Yokozawa, and Akutsu)
STM1/2
- Mirror mount stability with cables
- Beam positions on them
- Trans beam from STM2
IFI to IMMT1
- IFI injection: No clipping
- Beam position on IMMT1
- Trans beam of IMMT1
- No change to ISS path?
- ISS beam/CWP reflection beam extracting (??)
- the beam paths are clear?
- The beams hit around the center of windows?
- The reflected beams on the windows are dumped?
IMMT1-IMMT2
- Beam clearance: no problem
- Beam position on IMMT2
IMMT2-PRM
- Main beam/misaligned beam clearances: no problem against the beam dumper
- The misaligned beam position: hits on the dumper(?) and the temp enhancement was detected.
Around PRM
- Beam position on PRM
- IR beam in the midsize baffles(HR/AR side)
Beam Dumper
- Thermometer works?
Oplev Check for IMMT1. (Yokozawa-kun)
Beam Power
Beam Path Clearance
- IMMT1
QPD centering
Calibration
PYL Separation(after pumping?)
Spectrum Health
Oplev beam's stray light influence
- almost no light? as before.
Oplev table covering
- we will do this after closing.
(5)IFI-IMMT tank
Stray light mitigation(Akutus-kun and selected persons) - The predicted stray beams are dumped? - Is there any missing stray beam paths?
ISS beam/CWP reflection beam extracting (??) - the beam paths are clear? - The beams hit around the center of windows? - The reflected beams on the windows are dumped?
(The IFI new poles seem to be dangerous due to the vibration made by drilling.)
Beam dumper(Akutsu-kun and selected pesrons) - Does the thermometer works?
(6)Vacuum system (Kimura-san / Uchiyama-kun and their selected persons)
Numbering for all ports.
Check the flange seal surface condition.
Decide where the elastomer/Metal gasket will be used.
Top hat seal surface check for SRM/2/3 BS PRM/2/3.
ICF152 flange preparation for the new reducer flanges at SRM/PRM.
Check dust/fungus in stocked tubes/bellows.
(7)Cleanness of Mirrors HR/AR
FC was done for all mirrors' HR/AR, except for OMC Typ-C mirrors.
Check the surfaces and inside again before closing, and blow/absorb as much as possible if you find anything.
(8)Vacuum tank cleaning
In Basic, the cleaning was done after FC. Check inside again and clean just before closing if you find something.