2020.07.03
2018.11.14
2018.11.1
2018.10.25
2018.10.16
2018.8.24
2018.8.21
2018.8.17
Design
current parts configration (2020.6)
Assembly
Test in PSL room
Capper flange installation
Installation
Initial PRM (mis)alignment to the dump
DGS
High power test
Thermal conductivity
Circuit problem
Heat problem
To protected page