Scraps of text for incorporation in the VIS Meeting Minutes
KAGRA/Subgroups/VIS/MeetingNAOJ
- Type B
- Hirata-san finished the design of the trolley system (including adapter plates for the mirror box).
- Mirapro reported that rails for the trolley system had a long lead time, so we decided to order them separately.
- IM and BS flags were ordered.
- Tatsumi-san ordered the prism gluing jig parts for the mirror box.
- Hirata-san measured another SF.
- Mark worked on the assembly procedure.
- Fabian worked on the Mathematica/Matlab model of the BS.