Agenda/Minutes on 2021/1/8
CRY+VIS Interface Meeting
13:30-
Participants:
- Schedule for IX: Connection of ITMX is scheduled in the week of 2/8.
- Schedule for IY: Cooling of payload is scheduled from 1/12.
- Corrugate tube fixing jig: Re-measurement in IYV is planed.
- Commissioning in vacuum:
- Acceptance check items:
- Jig for FC painting:
- PF actuator:
VIS Meeting
14:00-
Participants:
Progress report
General
Type-A
- Remedy work in IXV.
- Replaced three blades for TF.
- Mounted the ballast weight on the top plate of TF keystone.
- Assembled and tested the limit switches for the yaw and vertical FR.
- Assembled the geophones into the pods.
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- Type-B remedy work is on going.
- Remedy work in IXV was started.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
The week from 1/11
- Takahashi: ?
- Sato: ?
- Hirata: ?
- Yano: ?
Next meeting
- On 2020/1/15(Fri)