Narrow Angle Baffle
|
|
Links to knowledge
Task list
Note: some of the tasks can be done in parallel.
- Make the clean booth clean and useful; prepare tables, shelves, ethanol, tools...
- Open the side flanges and top lid; attach white tapes (SPV-202) to the open flanges to protect them.
- Check the positions and rigidity of the Inoue-tower, and the dirtiness.
- Check also the Inoue-tower's fixing method; at least IXA it seems need to be re-worked.
- Measure several heights and widths
- Make grooves to be refereneces to locate the NAB finally.