6574
Comment:
|
6835
|
Deletions are marked like this. | Additions are marked like this. |
Line 26: | Line 26: |
* [[https://gwcenter.icrr.u-tokyo.ac.jp/inout|Application to enter the KAGRA mine]] | |
Line 28: | Line 27: |
* TV meeting room at Hokubu-kaikan: [[http://www.supersaas.jp/schedule/kamioka-house/KAIGI|Reservation page]] | |
Line 34: | Line 32: |
== How to work at the KAGRA site? == * Material of morning meeting in the Dropbox folder (in Japanese): [[https://www.dropbox.com/sh/4ctx4n1yh4grew1/AACrK1mNORiutvNHKjViblsja?dl=0| Take a file named today's date. ]] * Application to enter the KAGRA mine: [[https://gwcenter.icrr.u-tokyo.ac.jp/inout|Application page]] * How to order items you need (in Japanese): [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5145|Proceedure]] |
|
Line 35: | Line 39: |
* Morning meeting (in Japanese): [[https://www.dropbox.com/sh/4ctx4n1yh4grew1/AACrK1mNORiutvNHKjViblsja?dl=0|Material]] | * TV meeting room at Hokubu-kaikan: [[http://www.supersaas.jp/schedule/kamioka-house/KAIGI|Reservation page]] |
KAGRA Wiki
News
iKAGRA Observation page top (Observation: 3/15-31, 4/11-4/25)
Public lecture series for the 100th Anniversary of General Relativity
Meetings |
KAGRA collaboration meeting |
Documents |
KAGRA log |
Task management |
Tools |
How to upload documents to JGWDoc (Japanese, English) |
|
Observation |
Observation top |
Site information
ATTENTION! No stores in Mozumi(KAGRA site area). Please bring your own food and drinks.
- Accommodation during KAGRA stay: YUKI house/Loco motion at Osawano:
How to take garbage away in KAGRA site (in Japanese): Manual
How to work at the KAGRA site?
Material of morning meeting in the Dropbox folder (in Japanese): Take a file named today's date.
Application to enter the KAGRA mine: Application page
How to order items you need (in Japanese): Proceedure
Application for requesting mine work to Kamioka-kougyo (in Japanese): Application form
TV meeting room at Hokubu-kaikan: Reservation page
Publication Policy
CPC publication policy (inc. the procedure to submit for the JSPS meetings)
Technical information
Table of KAGRA location (Table)
Subsystems
Subgroup name |
Links |
|||
1 |
Tunnel |
TUN |
||
2 |
Facility |
FCL |
|
|
3 |
Vacuum |
VAC |
|
|
4 |
Cryogenics |
CRY |
||
5 |
Vibration Isolation |
VIS |
||
6 |
Mirror |
MIR |
|
|
7 |
Laser |
LAS |
|
|
8 |
Main Interferometer |
MIF |
|
|
9 |
Input/Output Optics |
IOO |
||
10 |
Auxiliary Optics Subsystem |
AOS |
||
11 |
Analog Electronics |
AEL |
||
12 |
Digital System |
DGS |
||
13 |
Data Management |
DMG |
|
|
14 |
Data Analysis |
DAS |
|
|
15 |
Geophysics Interferometer |
GIF |
|
|
16 |
Detector Characterization |
DET |
||
** |
Advanced R&D |
|
|
|
** |
NAOJ Test alog |
(NAOJ) |
|
* Some of the activities in the mine by NAOJ group are reported on NAOJ test alog.
Target Sensitivity of bKAGRA
KAGRA Documents
Others
Misc. (tools, past discussions, etc.)