KAGRA Wiki
News
| Meetings | KAGRA collaboration meeting  | Documents | |
| Special WG' | KAGRA Roadmap | Tools | KAGRA conference calendar | 
Subsystems
| Subgroup name | Links | |||
| 1 | Tunnel | TUN | ||
| 2 | Facility | FCL | 
 | |
| 3 | Vacuum | VAC | 
 | |
| 4 | Cryogenics | CRY | ||
| 5 | Vibration Isolation | VIS | ||
| 6 | Mirror | MIR | 
 | |
| 7 | Laser | LAS | 
 | |
| 8 | Main Interferometer | MIF | 
 | |
| 9 | Input/Output Optics | IOO | 
 | |
| 10 | Auxiliary Optics Subsystem | AOS | ||
| 11 | Analog Electronics | AEL | ||
| 12 | Digital System | DGS | ||
| 13 | Data Analysis | DAS | 
 | |
| 14 | Geophysics Interferometer | GIF | 
 | |
| ** | Detector Characterization | DC | ||
Project time-line
- Time-line chart is here (password protected). 
- iKAGRA wiki: iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration. 
- bKAGRA wiki: bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration. 
Target Sensitivity of bKAGRA
KAGRA Official Documents
Others
- Misc. (tools, past discussions, etc.) 

